GQA
Level 2
QN: 601/8329/9
Curriculum Active
GQA Level 2 NVQ Diploma in Roofing Occupations (Construction)
Official qualification regulated by Ofqual, awarded by GQA. Classified as a Occupational Qualification. Total guided learning hours: 295 hours.
Qualification Level
Level 2
Awarding Body
GQA
Syllabus Units
8 Units
Guided Hours
295 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Conforming to General Health, Safety and Welfare in the Workplace.
Verified
Key Learning Objectives:
- Comply with all workplace health, safety and welfare legislation requirements.
- Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures
- Comply with organisational policies and procedures to contribute to health, safety and welfare
- Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
- Comply with and support all organisational security arrangements and approved procedures.
2
Conforming to Productive Working Practices in the Workplace
Verified
Key Learning Objectives:
- Communicate with others to establish productive work practices
- Follow organisational procedures to plan the sequence of work
- Maintain relevant records in accordance with the organisational procedures
- Maintain good working relationships when conforming to productive working practices
3
Installing plain tile roof coverings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing plain tile roof coverings.
- Know how to comply with relevant legislation and official guidance when installing plain tile roof coverings.
- Maintain safe and healthy working practices when installing plain tile roof coverings.
- Select the required quantity and quality of resources for the methods of work to install plain tile roof coverings., Minimise the risk of damage to the work and surrounding area when installing plain tile roof coverings.
- Complete the work within the allocated time when installing plain tile roof coverings.
- Comply with the given contract information to install plain tile roof coverings to the required specification.
4
Installing pre-formed weathering flashings to roofs in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing pre-formed weathering flashings to roofs
- Know how to comply with relevant legislation and official guidance when installing pre-formed weathering flashings to roofs
- Maintain safe and healthy working practices when installing pre-formed weathering flashings to roofs
- Select the required quantity and quality of resources for the methods of work to install pre-formed weathering flashings to roofs, Minimise the risk of damage to the work and surrounding area when installing pre-formed weathering flashings to roofs
- Complete the work within the allocated time when installing pre-formed weathering flashings to roofs
- Comply with the given contract information to install pre-formed weathering flashings to roofs to the required specification.
5
Installing regular sized natural roof slate to standard roof details in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing regular sized natural roof slate to standard roof details.
- Know how to comply with relevant legislation and official guidance when installing regular sized natural roof slate to standard roof details.
- Maintain safe and healthy working practices when installing regular sized natural roof slate to standard roof details.
- Select the required quantity and quality of resources for the methods of work to install regular sized natural roof slate to standard roof details., Minimise the risk of damage to the work and surrounding area when installing regular sized natural roof slate to standard roof details.
- Complete the work within the allocated time when installing regular sized natural roof slate to standard roof details.
- Comply with the given contract information to install regular sized natural roof slate to standard roof details to the required specification.
6
Installing single-lap roof tiles to a variable gauge in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing single-lap roof tiles to a variable gauge
- Know how to comply with relevant legislation and official guidance when installing single-lap roof tiles to a variable gauge
- Maintain safe and healthy working practices when installing single-lap roof tiles to a variable gauge
- Select the required quantity and quality of resources for the methods of work to install single-lap roof tiles to a variable gauge, Minimise the risk of damage to the work and surrounding area when installing single-lap roof tiles to a variable gauge
- Complete the work within the allocated time when installing single-lap roof tiles to a variable gauge
- Comply with the given contract information to install single-lap roof tiles to a variable gauge to the required specification.
7
Installing underlay, battens and roofing components in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing underlay, battens and roofing components
- Know how to comply with relevant legislation and official guidance when installing underlay, battens and roofing components
- Maintain safe and healthy working practices when installing underlay, battens and roofing components
- Select the required quantity and quality of resources for the methods of work to install underlay, battens and roofing components, Minimise the risk of damage to the work and surrounding area when installing underlay, battens and roofing components
- Complete the work within the allocated time when installing underlay, battens and roofing components
- Comply with the given contract information to install underlay, battens androofing components to the required specification
8
Moving, Handling and Storing Resources in the Workplace
Verified
Key Learning Objectives:
- Comply with given information when moving, handling and/or storing resources
- Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources
- Maintain safe working practices when moving, handling and/or storing resources
- Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources, Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources
- Complete the work within the allocated time when moving, handling and/or storing resources.
- Comply with the given occupational resource information to move, handle and/or store resources to the required guidance
Regulatory & Verification Details
- Qualification Number (QN)
- 601/8329/9
- Regulated Status
- Available to learners
- Awarding Body
- GQA
- Qualification Type
- Occupational Qualification
- Operational Start
- Feb 2016