    Highfield Level 2 NVQ Diploma in Construction and Civil Engineering Operations (Drainage Construction) (RQF)

    Official qualification regulated by Ofqual, awarded by Highfield. Classified as a Vocationally-Related Qualification. Total guided learning hours: 276 hours.

    Qualification Level
    Level 2
    Awarding Body
    Highfield
    Syllabus Units
    6 Units
    Guided Hours
    276 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to general health, safety and welfare in the workplace

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures
    • Comply with organisational policies and procedures to contribute to health, safety and welfare
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area
    • Comply with and support all organisational security arrangements and approved procedures
    2

    Conforming to productive working practices in the workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices
    • Follow organisational procedures to plan the sequence of work
    • Maintain relevant records in accordance with the organisational procedures
    • Maintain good working relationships when conforming to productive working practices
    3

    Installing drainage in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing drainage
    • Know how to comply with relevant legislation and official guidance when installing drainage
    • Maintain safe and healthy working practices when installing drainage
    • Select the required quantity and quality of resources for the methods of work to install drainage
    • Minimise the risk of damage to the work and surrounding area when installing drainage
    • Complete the work within the allocated time when installing drainage
    • Comply with the given contract information to install drainage to the required specification
    4

    Installing, maintaining and removing temporary excavation support in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, maintaining and removing temporary excavation support
    • Know how to comply with relevant legislation and official guidance when installing, maintaining and removing temporary excavation support
    • Maintain safe and healthy working practices when installing, maintaining and removing temporary excavation support
    • Select the required quantity and quality of resources for the methods of work to install
    • maintain and remove temporary excavation support
    • Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing temporary excavation support
    • Complete the work within the allocated time when installing, maintaining and removing temporary excavation support
    • Comply with the given contract information to install
    • maintain and remove temporary excavation support to the required specification
    5

    Installing, maintaining and removing work area protection and safety equipment in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, maintaining, and removing work area protection and safety equipment
    • Know how to comply with relevant legislation and official guidance when installing, maintaining, and removing work area protection and safety equipment
    • Maintain safe and healthy working practices when installing, maintaining, and removing work area protection and safety equipment
    • Select the required quantity and quality of resources for the methods of work to install
    • maintain and remove work area protection and safety equipment
    • Minimise the risk of damage to the work and surrounding area when installing, maintaining, and removing work area protection and safety equipment
    • Complete the work within the allocated time when installing, maintaining, and removing work area protection and safety equipment
    • Comply with the given contract information to install
    • maintain, and remove work area protection and safety equipment to the required specification
    6

    Setting out secondary dimensional work control in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to setting out dimensional control of the work
    • Know how to comply with relevant legislation and official guidance to set out dimensional control of the work
    • Maintain safe and healthy working practices when setting out dimensional control of the work
    • Select the required quantity and quality of resources to set out dimensional control of the work
    • Minimise the risk of damage to the work and surrounding area when setting out dimensional control of the work
    • Complete the work within the allocated time when setting out dimensional control of the work
    • Comply with the given contract information to set out dimensional control of the work to the required specification

    Regulatory & Verification Details

    Qualification Number (QN)
    610/5652/2
    Regulated Status
    Available to learners
    Awarding Body
    Highfield
    Qualification Type
    Vocationally-Related Qualification
    Operational Start
    Apr 2025