Highfield
Level 2
QN: 610/6583/3
Curriculum Active
Highfield Level 2 NVQ Diploma in Site Logistics Operations (Construction) (RQF)
Official qualification regulated by Ofqual, awarded by Highfield. Classified as a Occupational Qualification. Total guided learning hours: 3731 hours.
Qualification Level
Level 2
Awarding Body
Highfield
Syllabus Units
44 Units
Guided Hours
3731 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Conforming to general health, safety and welfare in the workplace
Verified
Key Learning Objectives:
- Comply with all workplace health, safety and welfare legislation requirements
- Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures
- Comply with organisational policies and procedures to contribute to health, safety and welfare
- Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area
- Comply with and support all organisational security arrangements and approved procedures
2
Conforming to productive working practices in the workplace
Verified
Key Learning Objectives:
- Communicate with others to establish productive work practices
- Follow organisational procedures to plan the sequence of work
- Maintain relevant records in accordance with the organisational procedures
- Maintain good working relationships when conforming to productive working practices
3
Controlling vehicular traffic on construction sites in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when controlling vehicular traffic on construction sites
- Know how to comply with relevant legislation and official guidance when controlling vehicular traffic on construction sites
- Maintain safe and healthy working practices when controlling vehicular traffic on construction sites
- Select the required quantity and quality of resources for the methods of work to control vehicular traffic on construction sites
- Minimise the risk of damage to the work and surrounding area when controlling vehicular traffic on construction sites
- Complete the work within the allocated time when controlling vehicular traffic on construction sites
- Comply with the given contract information to control vehicular traffic on construction sites to the required specification
4
Coordinating construction resources in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when coordinating construction resources
- Know how to comply with relevant legislation and official guidance when coordinating construction resources
- Maintain safe and healthy working practices when coordinating construction resources
- Select the required quantity and quality of resources for the methods of work to coordinate construction resources
- Minimise the risk of damage to the work and surrounding area when coordinating construction resources
- Complete the work within the allocated time when coordinating construction resources
- Comply with the given contract information to coordinate construction resources to the required specification
5
Erecting and dismantling access/working platforms in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when erecting and dismantling access/working platforms
- Know how to comply with relevant legislation and official guidance when erecting and dismantling access/working platforms
- Maintain safe working practices when erecting and dismantling access/working platforms
- Select the required quantity and quality of resources for the methods of work to erect and dismantle access/working platforms
- Minimise the risk of damage to the work and surrounding area when erecting and dismantling access/working platforms
- Complete the work within the allocated time when erecting and dismantling access/working platforms
- Comply with the given contract information to erect and dismantle access/working platforms to the required specification
6
Installing, maintaining, and removing work area protection and safety equipment in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, maintaining and removing work area protection and safety equipment
- Know how to comply with relevant legislation and official guidance when establishing work area protection and safety
- Maintain safe and healthy working practices when installing, maintaining and removing work area protection and safety equipment
- Select the required quantity and quality of resources for the methods of work to install
- maintain and remove work area protection and safety equipment
- Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing work area protection and safety equipment
- Complete the work within the allocated time when installing, maintaining and removing work area protection and safety equipment
- Comply with the given contract information to install
- maintain and remove work area protection and safety equipment to the required specification
7
Maintaining construction site fire management systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when maintaining construction site fire management systems
- Know how to comply with relevant legislation and official guidance when maintaining construction site fire management systems
- Maintain safe and healthy working practices when maintaining construction site fire management systems
- Select the required quantity and quality of resources for the methods of work to maintain construction site fire management systems
- Minimise the risk of damage to the work and surrounding area when maintaining construction site fire management systems
- Complete the work within the allocated time when maintaining construction site fire management systems
- Comply with the given contract information to maintain construction site fire management systems to the required specification
8
Maintaining construction site set-up systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when maintaining construction site set-up systems
- Know how to comply with relevant legislation and official guidance when maintaining construction site set-up systems
- Maintain safe and healthy working practices when maintaining construction site set-up systems
- Select the required quantity and quality of resources for the methods of work to maintain construction site set-up systems
- Minimise the risk of damage to the work and surrounding area when maintaining construction site set-up systems
- Complete the work within the allocated time when maintaining construction site set-up systems
- Comply with the given contract information to maintain construction site set-up systems to the required specification
9
Maintaining construction site waste management systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when maintaining construction site waste management systems
- Know how to comply with relevant legislation and official guidance when maintaining construction site waste management systems
- Maintain safe and healthy working practices when maintaining construction site waste management systems
- Select the required quantity and quality of resources for the methods of work to maintain construction site waste management systems
- Minimise the risk of damage to the work and surrounding area when maintaining construction site waste management systems
- Complete the work within the allocated time when maintaining construction site waste management systems
- Comply with the given contract information to maintain construction site waste management systems to the required specification
10
Moving, handling and storing resources in the workplace
Verified
Key Learning Objectives:
- Comply with given information when moving, handling and/or storing resources
- Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources
- Maintain safe working practices when moving, handling and/or storing resources
- Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources
- Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources
- Complete the work within the allocated time when moving, handling and/or storing resources
- Comply with the given occupational resource information to move, handle and/or store resources to the required guidance
11
Preparing and operating boom-type mobile elevating work platforms (MEWP) in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and using of boom-type MEWPs to access areas to carry out the work
- Organise with others the sequence and operation in which accessing operations using boom-type MEWPs are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out accessing operations using boom-type MEWPs
- Maintain safe and healthy working practices when preparing for and carrying out accessing operations using boom-type MEWPs
- Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using boom-type MEWPs
- Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas
- Complete the work within the allocated time when preparing to and accessing work areas using boom-type MEWPs
- Comply with the given contract information to access areas to carry out work using boom-type MEWPs to the required specification
12
Preparing and operating compact cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of compact cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using compact cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using compact cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using compact cranes5 Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using compact cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using compact cranes to the required specification
13
Preparing and operating container handlers to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of container handlers to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using container handlers are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using container handlers
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using container handlers
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using container handlers
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using container handlers to the required specification
14
Preparing and operating crawler cranes (above 10 tonnes) to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of crawler cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using crawler cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using crawler cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using crawler cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using crawler cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using crawler cranes to the required specification
15
Preparing and operating crawler-tractor side booms to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of side booms to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using side booms are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using side booms
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using side booms
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using side booms
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using side booms to the required specification
16
Preparing and operating excavator cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of excavator cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using excavator cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using excavator cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using excavator cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using excavator cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using excavator cranes to the required specification
17
Preparing and operating forward tipping dumpers to receive, transport and discharge materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of forward tipping dumpers to carry out transporting and discharging operations
- Organise with others the sequence and operation in which transporting and discharging operations using forward tipping dumpers are to be carried out
- Know how to follow relevant legislation and official guidance when carrying out transporting and discharging operations using forward tipping dumpers
- Maintain safe and healthy working practices when preparing for and carrying out transporting and discharging operations using forward tipping dumpers
- Request and select the required quantity and quality of resources to prepare for and carry out transporting and discharging operations using forward tipping dumpers
- Minimise the risk of damage to the work and surrounding area when preparing to and transporting and discharging materials
- Complete the work within the allocated time when preparing to and discharging materials using forward tipping dumpers
- Comply with the given contract information to receive, transport and discharge materials using forward tipping dumpers to the required specification
18
Preparing and operating hoists to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of hoists to lift and transfer loads
- Organise with others the sequence and operation in which lifting and transferring operations using hoist are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using hoists
- Maintain safe and healthy working practices when preparing for and carrying out lifting and transferring operations using hoists
- Request and select the required quantity and quality of resources to prepare for and carry out lifting and transferring operations using hoists
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift and transfer loads using hoists to the required specification
19
Preparing and operating industrial forklift trucks to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of industrial forklift trucks to lift, transfer and place loads
- Organise with others the sequence and operation in which industrial forklift truck operations are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads with industrial forklift trucks
- Maintain safe and healthy working practices when preparing for and carrying out forklift operations with industrial forklift trucks
- Request and select the required quantity and quality of resources to prepare for and carry out forklift operations with industrial forklift trucks
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using industrial forklift trucks to the required specification
20
Preparing and operating lorry loaders or knuckle booms to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of lorry loaders/knuckle booms to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using lorry loaders/knuckle booms are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using lorry loaders/knuckle booms
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using lorry loaders/knuckle booms
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using lorry loaders/knuckle booms
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using lorry loaders/knuckle booms to the required specification
21
Preparing and operating mast climber-type mobile elevating work platforms (MEWP) in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and using mast climber-type MEWPs to access areas to carry out the work
- Organise with others the sequence and operation in which accessing operations using mast climber-type MEWPs are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out accessing operations using mast climber-type MEWPs
- Maintain safe and healthy working practices when preparing for and carrying out accessing operations using mast climber-type MEWPs
- Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using mast climber-type MEWPs
- Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas
- Complete the work within the allocated time when preparing to and accessing work areas using mast climber-type MEWPs
- Comply with the given contract information to access areas to carry out work using mast climber-type MEWPs to the required specification
22
Preparing and operating mobile cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of mobile cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using mobile cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using mobile cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using mobile cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using mobile cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using mobile cranes to the required specification
23
Preparing and operating overhead cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of overhead cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using overhead cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using overhead cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using overhead cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using overhead cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using overhead cranes to the required specification
24
Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of powered units, tools or pedestrian plant, machinery or equipment
- Know how to comply with relevant legislation and official guidance to prepare and use powered units, tools or pedestrian plant, machinery or equipment
- Maintain safe and healthy working practices when preparing for and using powered units, tools or pedestrian plant, machinery or equipment
- Select the required quantity and quality of resources to prepare for and sustain powered units, tools or pedestrian plant, machinery or equipment
- Minimise the risk of damage to the work and surrounding area when preparing to and using powered units, tools or pedestrian plant, machinery or equipment
- Complete the work within the allocated time when preparing to and using powered units, tools or pedestrian plant, machinery or equipment
- Comply with the given contract information to operate powered units, tools or pedestrian plant, machinery or equipment to the required specification
25
Preparing and operating reach trucks to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of reach trucks to lift, transfer and place loads
- Organise with others the sequence and operation in which reach truck operations are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads with reach trucks
- Maintain safe and healthy working practices when preparing for and carrying out forklift operations with reach trucks
- Request and select the required quantity and quality of resources to prepare for and carry out forklift operations with reach trucks
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using reach trucks to the required specification
26
Preparing and operating rear tipping dump trucks to receive, transport and discharge materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of rear tipping dump trucks to carry out transporting and discharging operations
- Organise with others the sequence and operation in which transporting and discharging operations using rear tipping dump trucks are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out transporting and discharging operations using rear tipping dump trucks
- Maintain safe and healthy working practices when preparing for and carrying out transporting and discharging operations using rear tipping dump trucks
- Request and select the required quantity and quality of resources to prepare for and carry out transporting and discharging operations using rear tipping dump trucks
- Minimise the risk of damage to the work and surrounding area when preparing to and transporting and discharging materials
- Complete the work within the allocated time when preparing to and transporting and discharging materials using rear tipping dump trucks
- Comply with the given contract information to receive, transport and discharge materials using rear tipping dump trucks to the required specification
27
Preparing and operating remote controlled tower cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of remote controlled tower cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using remote controlled tower cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using remote controlled tower cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using remote controlled tower cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using remote controlled tower cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using remote controlled tower cranes to the required specification
28
Preparing and operating rough terrain masted forklifts to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of rough terrain masted forklifts to lift, transfer and place loads
- Organise with others the sequence and operation in which rough terrain masted forklift operations are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads with rough terrain masted forklifts
- Maintain safe and healthy working practices when preparing for and carrying out forklift operations with rough terrain masted forklifts
- Request and select the required quantity and quality of resources to prepare for and carry out forklift operations using rough terrain masted forklifts
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using rough terrain masted forklifts to the required specification
29
Preparing and operating scissor-type mobile elevating work platforms (MEWP) in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and using scissor-type MEWPs to access areas to carry out the work
- Organise with others the sequence and operation in which accessing operations using scissor-type MEWPs are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out accessing operations using scissor-type MEWPs
- Maintain safe and healthy working practices when preparing for and carrying out accessing operations using scissor-type MEWPs
- Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using scissor-type MEWPs
- Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas
- Complete the work within the allocated time when preparing to and accessing work areas using scissor-type MEWPs
- Comply with the given contract information to access areas to carry out work using scissor-type MEWPs to the required specification
30
Preparing and operating self-propelled bowsers to receive, transport and discharge materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of self-propelled bowsers to carry out transporting and discharging operations
- Organise with others the sequence and operation in which transporting and discharging operations using self-propelled bowsers are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out transporting and discharging operations using self-propelled bowsers
- Maintain safe and healthy working practices when preparing for and carrying out transporting and discharging operations using self-propelled bowsers
- Request and select the required quantity and quality of resources to prepare for and carry out transporting and discharging operations using self-propelled bowsers
- Minimise the risk of damage to the work and surrounding area when preparing to and transporting and discharging materials
- Complete the work within the allocated time when preparing to and transporting and discharging materials using self-propelled bowsers
- Comply with the given contract information to receive, transport and discharge materials using self-propelled bowsers to the required specification
31
Preparing and operating self-propelled modular transporters (SPMT) to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of SPMTs to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using SPMTs are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using SPMTs
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using SPMTs
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using SPMTs
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using SPMTs to the required specification
32
Preparing and operating sideloader forklifts to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of sideloader forklifts to lift, transfer and place loads
- Organise with others the sequence and operation in which sideloader forklift operations are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads with sideloader forklifts
- Maintain safe and healthy working practices when preparing for and carrying out forklift operations with sideloader types
- Request and select the required quantity and quality of resources to prepare for and carry out forklift operations with sideloader types
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using sideloader forklifts to the required specification
33
Preparing and operating skip handlers to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of skip handlers to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using skip handlers are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using skip handlers
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using skip handlers
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using skip handlers
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using skip handlers to the required specification
34
Preparing and operating static concrete placing booms to discharge and place materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of static concrete placing booms to carry out concrete placing operations
- Organise with others the sequence and operation in which concrete placing operations using placing booms are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out concrete placing operations using placing booms
- Maintain safe and healthy working practices when preparing for and carrying out concrete placing operations using placing booms
- Request and select the required quantity and quality of resources to prepare for and carry out concrete placing operations using placing booms
- Minimise the risk of damage to the work and surrounding area when preparing to and placing materials
- Complete the work within the allocated time when preparing to and placing materials using placing booms
- Comply with the given contract information to prepare, discharge and place materials using placing booms to the required specification
35
Preparing and operating telescopic handlers to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of telescopic handlers to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using telescopic handlers are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using telescopic handlers
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using telescopic handlers
- Request and select the required quantity and quality of resources to prepare for and carry out telescopic handler operations
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using telescopic handlers to the required specification
36
Preparing and operating tower cranes to lift and transfer loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of tower cranes to lift, transfer and place loads
- Organise with others the sequence and operation in which lifting operations using tower cranes are to be carried out
- Know how to comply with relevant legislation and official guidance when lifting and transferring loads using tower cranes
- Maintain safe and healthy working practices when preparing for and carrying out lifting operations using tower cranes
- Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using tower cranes
- Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads
- Complete the work within the allocated time when preparing to and lifting and transferring loads
- Comply with the given contract information to lift, transfer and place loads using tower cranes to the required specification
37
Preparing and operating tractors with towed equipment for non-agricultural activities in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of tractors with towed equipment to carry out non-agricultural activities
- Organise with others the sequence and operation in which non-agricultural activities using tractors with towed equipment are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out non-agricultural activities using tractors with towed equipment
- Maintain safe and healthy working practices when preparing for and carrying out non-agricultural activities using tractors with towed equipment
- Request and select the required quantity and quality of resources to prepare for and carry out non-agricultural activities using tractors with towed equipment
- Minimise the risk of damage to the work and surrounding area when preparing to and carrying out non-agricultural activities
- Complete the work within the allocated time when preparing to and carrying out non-agricultural activities using tractors with towed equipment
- Comply with the given contract information to carry out non-agricultural activities using tractors with towed equipment to the required specification
38
Preparing and operating trailer-mounted concrete pumps to receive, pump and discharge materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of concrete pumps to carry out pumping and discharging operations
- Organise with others the sequence and operation in which pumping and discharging operations using concrete pumps are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out pumping and discharging operations using concrete pumps
- Maintain safe and healthy working practices when preparing for and carrying out pumping operations using concrete pumps
- Request and select the required quantity and quality of resources to prepare for and carry out pumping operations using concrete pumps
- Minimise the risk of damage to the work and surrounding area when preparing to and pumping materials using concrete pumps
- Complete the work within the allocated time when preparing to and pumping and discharging materials using concrete pumps
- Comply with the given contract information to receive, pump and discharge materials using concrete pumps to the required specification
39
Preparing and operating truck-mounted boom concrete pumps to receive, pump and discharge materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of concrete pumps to carry out pumping and discharging operations
- Organise with others the sequence and operation in which pumping and discharging operations using concrete pumps are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out pumping and discharging operations using concrete pumps
- Maintain safe and healthy working practices when preparing for and carrying out pumping operations using concrete pumps
- Request and select the required quantity and quality of resources to prepare for and carry out pumping operations using concrete pumps
- Minimise the risk of damage to the work and surrounding area when preparing to and pumping materials using concrete pumps
- Complete the work within the allocated time when preparing to and pumping and discharging materials using concrete pumps
- Comply with the given contract information to receive, pump and discharge materials using concrete pumps to the required specification
40
Preparing and operating volumetric trucks to receive and transport materials in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of volumetric trucks to carry out receiving and transporting operations
- Organise with others the sequence and operation in which receiving and transporting operations using volumetric trucks are to be carried out
- Know how to comply with relevant legislation and official guidance when carrying out receiving and transporting operations using volumetric trucks
- Maintain safe and healthy working practices when preparing for and carrying out receiving and transporting operations using volumetric trucks
- Request and select the required quantity and quality of resources to prepare for and carry out receiving and transporting operations using volumetric trucks
- Minimise the risk of damage to the work and surrounding area when preparing to and receiving and transporting materials
- Complete the work within the allocated time when preparing to and receiving and transporting materials using volumetric trucks
- Comply with the given contract information to receiving and transporting materials using volumetric trucks to the required specification
41
Preparing for, and arranging and securing plant or machinery for transportation in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation of, and arranging and securing plant or machinery for transportation
- Know how to comply with relevant legislation and official guidance when arranging and securing plant or machinery for transportation
- Maintain safe and healthy working practices when preparing for and arranging and securing plant or machinery for transportation
- Select the required quantity and quality of resources to prepare for, and arrange and secure plant or machinery for transportation
- Minimise the risk of damage to the work and surrounding area when preparing for and arranging and securing plant or machinery for transportation
- Complete the work within the allocated time when preparing to, and arranging and securing plant or machinery for transportation
- Comply with the given contract information to prepare to, and arrange and secure plant or machinery for transportation to the required specification
42
Preparing to and directing and guiding the movement of vehicles, plant or machinery in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to preparing to, and directing and guiding the movement of vehicles, plant or machinery
- Organise with others the sequence and operation in which directing and guiding the movement of vehicles, plant or machinery is to be carried out
- Know how to comply with relevant legislation and official guidance when directing and guiding the movement of vehicles, plant or machinery
- Maintain safe and healthy working practices when preparing to, directing and guiding the movement of vehicles, plant or machinery
- Select the required quantity and quality of resources to prepare to, and direct and guide the movement of vehicles, plant or machinery
- Minimise the risk of damage to the work and surrounding area when preparing to and directing and guiding the movement of vehicles, plant or machinery
- Complete the work within the allocated time when preparing to, and directing and guiding the movement of vehicles, plant or machinery
- Comply with the given contract information to prepare to, and direct and guide the movement of vehicles, plant or machinery to the required specification
43
Segregating the area for highways works in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when segregating the area for highways works
- Know how to comply with relevant legislation and official guidance when segregating the area for highways works
- Maintain safe and healthy working practices when segregating the area for highways works
- Select the required quantity and quality of resources for the methods of work to segregate the area for highways works
- Minimise the risk of damage to the work and surrounding area when segregating the area for highways works
- Complete the work within the allocated time when segregating the area for highways works
- Comply with the given contract information when segregating the area for highways works to the required specification
44
Slinging and hand signalling the movement of suspended loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation for and the slinging and signalling of loads
- Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out
- Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads
- Maintain safe and healthy working practices when preparing for and slinging and signalling loads
- Select the required quantity and quality of resources to prepare for and when slinging and signalling loads
- Minimise the risk of damage to the work and surrounding area when preparing to and slinging and signalling loads
- Complete the work within the allocated time when preparing to and slinging and signalling loads
- Comply with the given contract information to prepare to and sling and signal suspended loads for movement to the required specification
Regulatory & Verification Details
- Qualification Number (QN)
- 610/6583/3
- Regulated Status
- Available to learners
- Awarding Body
- Highfield
- Qualification Type
- Occupational Qualification
- Operational Start
- Oct 2025