IMI
    Level 3
    QN: 610/3971/8
    Curriculum Active

    IMI Level 3 Technical Specialist in Heavy Electric/Hybrid Vehicle System Repair and Replacement (Award)

    Official qualification regulated by Ofqual, awarded by IMI. Classified as a Technical Occupation Qualification. Total guided learning hours: 35 hours.

    Qualification Level
    Level 3
    Awarding Body
    IMI
    Syllabus Units
    2 Units
    Guided Hours
    35 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Heavy Electric/Hybrid Vehicle System Repair and Replacement

    Verified
    Key Learning Objectives:
    • Understand how to remove and replace high energy electrical system components
    • Be able to work safely on a heavy electric/hybrid vehicle
    • Be able to use information to carry out the task
    • Be able to use appropriate tools and equipment
    • Be able to remove and replace high energy electrical system components
    • Be able to record information and make suitable recommendations
    2

    Preparing Heavy Electric/Hybrid Vehicles for Repair

    Verified
    Key Learning Objectives:
    • Understand heavy electric/hybrid vehicle system components and operation
    • Understand the hazards when working with heavy electric/hybrid vehicles
    • Understand how to reduce the risks to themselves and others when carrying out work on and around heavy electric/hybrid vehicles
    • Understand how make a heavy electric/ hybrid high energy electrical system “safe” prior to repairs
    • Understand how to reinstate a heavy electric/hybrid vehicle high energy electrical system
    • Be able to make “safe” and reinstate a heavy electric/hybrid vehicle

    Regulatory & Verification Details

    Qualification Number (QN)
    610/3971/8
    Regulated Status
    Available to learners
    Awarding Body
    IMI
    Qualification Type
    Technical Occupation Qualification
    Operational Start
    Aug 2025
    Operational End
    Jul 2028