iPET Network
    Level 3
    QN: 603/7683/1
    Curriculum Active

    iPET Network Level 3 Award in Feline Emergency First Aid

    Official qualification regulated by Ofqual, awarded by iPET Network. Classified as a Other Vocational Qualification. Total guided learning hours: 6 hours.

    Qualification Level
    Level 3
    Awarding Body
    iPET Network
    Syllabus Units
    1 Units
    Guided Hours
    6 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Feline Emergency First Aid

    Verified
    Key Learning Objectives:
    • Understand the requirements of Feline Emergency First Aid, who can administer Feline Emergency First Aid and why Feline Emergency First Aid is important
    • Understand the importance of administering Feline Emergency First Aid and how to manage feline behaviour
    • Understand the classification of Emergencies
    • Understand how to put a cat in the recovery position
    • Understand the Primary Survey of Feline Emergency First Aid and actions to take following the DR ABC assessment
    • Understand the examination of an injured animal and the actions to take to manage shock
    • Assess and record key elements of feline vital statistics and conduct cat resuscitation (CPR)
    • Be able to dress and treat wounds
    • Understand choking, stings and poisoning and be able to give the necessary treatment
    • Understand the signs and treatment of hyperthermia, hypothermia and water inhalation
    • Understand the signs and treatment of a cat having a convulsion
    • Understand different types of burns
    • Understand what is required in a Feline Emergency First Aid kit and how to communicate in emergency situations

    Regulatory & Verification Details

    Qualification Number (QN)
    603/7683/1
    Regulated Status
    Available to learners
    Awarding Body
    iPET Network
    Qualification Type
    Other Vocational Qualification
    Operational Start
    Jul 2021
    Operational End
    Aug 2026