Lantra Awards
    Level 2
    QN: 603/5722/8
    Curriculum Active

    Lantra Awards Level 2 NVQ Diploma in Plant Operations (Construction) (Excavating)

    Official qualification regulated by Ofqual, awarded by Lantra Awards. Classified as a Occupational Qualification. Total guided learning hours: 1714 hours.

    Qualification Level
    Level 2
    Awarding Body
    Lantra Awards
    Syllabus Units
    11 Units
    Guided Hours
    1714 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to general health, safety and welfare in the workplace

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.2.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.3.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.4.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.5.
    • Comply with and support all organisational security arrangements and approved procedures.
    2

    Conforming to productive working practices in the workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.2.
    • Follow organisational procedures to plan the sequence of work.3.
    • Maintain relevant records in accordance with the organisational procedures.4.
    • Maintain good working relationships when conforming to productive working practices.
    3

    Moving, handling and storing resources in the workplace

    Verified
    Key Learning Objectives:
    • Comply with given information when moving, handling and/or storing resources.2.
    • Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.3.
    • Maintain safe working practices when moving, handling and/or storing resources.4.
    • Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources.5. Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
    • Complete the work within the allocated time when moving, handling and/or storing resources.7.
    • Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
    4

    Operating plant or machinery for non-operational activities in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when operating plant or machinery for non-operational activities.2 .
    • Organise with others the sequence in which the work is to be carried out when operating plant or machinery for non-operational activities.3 .
    • Know how to comply with relevant, current legislation, special legal status documents, official guidance and organisational procedures when operating plant or machinery for non-operational activities.4 .
    • Maintain safe and healthy working practices when operating plant or machinery for non-operational activities. 5 . Request and select the required quantity and quality of resources to operate plant or machinery for non-operational activities.6 . Minimise the risk of damage to the work and surrounding area when operating plant or machinery for non-operational activities. 7 .
    • Complete the work within the allocated time when operating plant or machinery for non-operational activities. 8 .
    • Comply with the given contract information to operate plant or machinery for non-operational activities to the required specification.
    5

    Preparing and operating 180° actual excavators to extract and excavate ground and loose materials in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of 180 degree excavators for extracting and excavating operations. 2 .
    • Organise with others the sequence and operation in which extracting and excavating operations using 180 degree excavators are to be carried out.3 .
    • Know how to comply with relevant legislation and official guidance when carrying out extracting and excavating operations using 180 degree excavators. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out extracting and excavating operations using 180 degree excavators.5 . Request and select the required quantity and quality of resources to prepare for and carry out extracting and excavating operations using 180 degree excavators. 6. Minimise the risk of damage to the work and surrounding area when preparing to and extracting and excavating materials. 7 .
    • Complete the work within the allocated time when preparing to and extracting and excavating materials. 8 .
    • Comply with the given contract information to extract materials using 180 degree excavators to the required specification.
    6

    Preparing and operating 360° excavators to excavate ground in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of 360 degree excavators to carry out excavating operations.2 .
    • Organise with others the sequence and operation in which excavating operations using 360 degree excavators are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out excavating operations using 360 degree excavators.4 .
    • Maintain safe and healthy working practices when preparing for and carrying out excavating operations using 360 degree excavators.5 . Request and select the required quantity and quality of resources to prepare for and carry out excavating operations using 360 degree excavators.6 . Minimise the risk of damage to the work and surrounding area when preparing to and excavating materials.7 .
    • Complete the work within the allocated time when preparing to and excavating materials. 8 .
    • Comply with the given contract information to excavate materials using 360 degree excavators to the required specification.
    7

    Preparing and operating crawler tractor dozers to carry out dozer operations in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of crawler tractor dozers for dozer operations.2 .
    • Organise with others the sequence and operation in which dozer operations using crawler tractor dozers are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out dozer operations using crawler tractor dozers. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out dozer operations using crawler tractor dozers. 5 . Request and select the required quantity and quality of resources to prepare for and carry out dozer operations using crawler tractor dozers. 6 . Minimise the risk of damage to the work and surrounding area when preparing to and carrying out dozer operations.7 .
    • Complete the work within the allocated time when preparing to and carrying out dozer operations. 8 .
    • Comply with the given contract information to carry out dozer operations using crawler tractor dozers to the required specification.
    8

    Preparing and operating draglines to excavate ground materials in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of draglines to carry out excavating operations. 2 .
    • Organise with others the sequence and operation in which excavating operations using draglines are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out excavating operations using draglines. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out excavating operations using draglines. 5 . Request and select the required quantity and quality of resources to prepare for and carry out excavating operations using draglines. 6 . Minimise the risk of damage to the work and surrounding area when preparing to and excavating materials. 7 .
    • Complete the work within the allocated time when preparing to and excavating materials. 8 .
    • Comply with the given contract information to excavate materials using draglines to the required specification.
    9

    Preparing and operating suction and vacuum excavators to excavate in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of suction and vacuum excavators to carry out excavating operations. 2 .
    • Organise with others the sequence and operation in which excavating operations using suction and vacuum excavators are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out excavating operations using suction and vacuum excavators. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out excavating operations using suction and vacuum excavators. 5 . Request and select the required quantity and quality of resources to prepare for and carry out excavating operations using suction and vacuum excavators. 6 . Minimise the risk of damage to the work and surrounding area when preparing to and excavating materials. 7 .
    • Complete the work within the allocated time when preparing to and excavating materials. 8 .
    • Comply with the given contract information to excavate materials using suction and vacuum excavators to the required specification.
    10

    Preparing and operating tracked loading shovels to excavate ground and loose materials in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of tracked loading shovels to carry out excavating operations. 2 .
    • Organise with others the sequence and operation in which excavating operations using tracked loading shovels are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out excavating operations using tracked loading shovels. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out excavating operations using tracked loading shovels. 5 . Request and select the required quantity and quality of resources to prepare for and carry out excavating operations using tracked loading shovels. 6 . Minimise the risk of damage to the work and surrounding area when preparing to and excavating materials. 7 .
    • Complete the work within the allocated time when preparing to and excavating materials. 8 .
    • Comply with the given contract information to excavate materials using tracked loading shovels to the required specification.
    11

    Preparing and operating trenchers to excavate ground in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of trenchers to carry out excavating operations.2 .
    • Organise with others the sequence and operation in which excavating operations using trenchers are to be carried out. 3 .
    • Know how to comply with relevant legislation and official guidance when carrying out excavating operations using trenchers. 4 .
    • Maintain safe and healthy working practices when preparing for and carrying out excavating operations using trenchers. 5 . Request and select the required quantity and quality of resources to prepare for and carry out excavating operations using trenchers. 6 . Minimise the risk of damage to the work and surrounding area when preparing to and excavating materials.7 .
    • Complete the work within the allocated time when preparing to and excavating materials. 8 .
    • Comply with the given contract information to excavate materials using trenchers to the required specification.

    Regulatory & Verification Details

    Qualification Number (QN)
    603/5722/8
    Regulated Status
    Available to learners
    Awarding Body
    Lantra Awards
    Qualification Type
    Occupational Qualification
    Operational Start
    Sept 2021