NOCN
Level 2
QN: 500/6364/9
Curriculum Active
NOCN Level 2 Certificate in Plant Operations (Groundworks)
Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Vocationally-Related Qualification. Total guided learning hours: 339 hours.
Qualification Level
Level 2
Awarding Body
NOCN
Syllabus Units
19 Units
Guided Hours
339 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Know how to operate a forward tipping dumper
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to complete the specified work tasks
- know how to shut down the machine
2
Know how to operate a ride-on roller
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to shut down the machine
3
Know how to operate an excavator 180 – above 5 tonnes
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to shut down the machine
4
Know how to operate an excavator 180 – below 5 tonnes
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to shut down the machine
5
Know how to operate an excavator 360° – below 10 tonnes
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to shut down the machine
6
Know how to operate an excavator 360° above 10 tonnes
Verified
Key Learning Objectives:
- know how to prepare the machine for work
- know how to drive and manoeuvre the machine
- know how to set up the machine for work
- know how to undertake the specified work tasks
- know how to shut down the machine
7
Operate a forward tipping dumper
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks
- complete the specified work tasks, shut down the machine
8
Operate a ride-on roller
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks, shut down the machine
9
Operate an excavator 180 – above 5 tonnes
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks, shut down the machine
10
Operate an excavator 180 – below 5 tonnes
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks, shut down the machine
11
Operate an excavator 360° – below 10 tonnes
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks, shut down the machine
12
Operate an excavator 360° above 10 tonnes
Verified
Key Learning Objectives:
- prepare the machine for work, drive and manoeuvre the machine, set up the machine for work
- undertake the specified work tasks, shut down the machine
13
Prepare and use a forward tipping dumper to carry out tipping duties and associated operations
Verified
Key Learning Objectives:
- prepare and set the machine up for work
- undertake travelling, manoeuvring and working tasks
- complete the work and shut down
14
Prepare and use a ride-on roller to carry out compacting tasks and associated operations
Verified
Key Learning Objectives:
- prepare the ride-on roller for work and set the machine up for work
- undertake travelling, manoeuvring and working tasks
- complete the work and shut down
15
Prepare and use an excavator 180 – above 5 tonnes, to carry out excavation duties and associated operations
Verified
Key Learning Objectives:
- prepare the excavator for work and set the machine up for work
- undertake travelling, manoeuvring and working tasks
- complete the work and shut down
16
Prepare and use an excavator 180 – below 5 tonnes, to carry out excavation and loading duties and associated operations
Verified
Key Learning Objectives:
- prepare the excavator for work and set the machine up for work
- undertake travelling, manoeuvring and working tasks
- complete the work and shut down
17
Prepare and use an excavator 360° – below 10 tonnes, to carry out excavating, loading, reinstatement duties and associated operations
Verified
Key Learning Objectives:
- prepare the excavator for work and set the machine up for work
- undertake travelling, manoeuvring and working tasks
- complete the work and shut down
18
Prepare and use an excavator 360° above 10 tonnes to carry out excavating and loading duties and associated operations
Verified
Key Learning Objectives:
- prepare and set the machine up for work
- undertake travelling and manoeuvring tasks
- undertake specified working tasks
- complete the work and shut down
19
Site safety and roles and responsibilities for plant operators
Verified
Key Learning Objectives:
- Know people’s roles and responsibilities within the sector
- Know information relevant to plant operators
- Know the principles and aims of health and safety at work
- Know about safety signs and notices
- Know how to identify and deal with hazards on construction sites
Regulatory & Verification Details
- Qualification Number (QN)
- 500/6364/9
- Regulated Status
- Available to learners
- Awarding Body
- NOCN
- Qualification Type
- Vocationally-Related Qualification
- Operational Start
- Sept 2009