NOCN
    Level 2
    QN: 603/0788/2
    Curriculum Active

    NOCN Level 2 NVQ Certificate in Interior Systems (Construction)

    Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 554 hours.

    Qualification Level
    Level 2
    Awarding Body
    NOCN
    Syllabus Units
    7 Units
    Guided Hours
    554 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to General Health, Safety and Welfare in the Workplace.

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    2

    Conforming to Productive Working Practices in the Workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.
    • Follow organisational procedures to plan the sequence of work.
    • Maintain relevant records in accordance with the organisational procedures.
    • Maintain good working relationships when conforming to productive working practices.
    3

    Finishing dry lining walls and ceilings in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when finishing dry lining walls and ceilings.2.
    • Know how to comply with relevant legislation and official guidance when finishing dry lining walls and ceilings.3.
    • Maintain safe working practices when finishing dry lining walls and ceilings.4.
    • Select the required quantity and quality of resources for the methods of work to finish dry lining and ceilings.5. Minimise the risk of damage to the work and surrounding area when finishing dry lining walls and ceilings.6.
    • Complete the work within the allocated time when finishing dry lining walls and ceilings.7.
    • Comply with the given contract information to finish dry lining walls and ceilings to the required specification.
    4

    Installing cavity barriers to floors and ceilings in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing cavity barriers to floors and ceilings.2.
    • Know how to comply with relevant legislation and official guidance when installing cavity barriers to floors and ceilings.3.
    • Maintain safe and healthy working practices when installing cavity barriers to floors and ceilings.4.
    • Select the required quantity and quality of resources for the methods of work to install cavity barriers to floors and ceilings.5. Minimise the risk of damage to the work and surrounding area when installing cavity barriers to floors and ceilings.6.
    • Complete the work within the allocated time when installing cavity barriers to floors and ceilings.7.
    • Comply with the given contract information to install cavity barriers to floors and ceilings to the required specification.
    5

    Installing plasterboard linings in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing plasterboard linings.2.
    • Know how to comply with relevant legislation and official guidance when installing plasterboard linings.3.
    • Maintain safe and healthy working practices installing plasterboard linings.4.
    • Select the required quantity and quality of resources for the methods of work to install plasterboard linings.5. Minimise the risk of damage to the work and surrounding area when installing plasterboard linings.6.
    • Complete the work within the allocated time when installing plasterboard linings.7.
    • Comply with the given contract information to install plasterboard linings to the required specification.
    6

    Installing suspended ceiling systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing suspended ceiling systems.2.
    • Know how to comply with relevant legislation and official guidance when installing suspended ceiling systems.3.
    • Maintain safe and healthy working practices when installing suspended ceiling systems.4.
    • Select the required quantity and quality of resources for the methods of work to install suspended ceiling systems.5. Minimise the risk of damage to the work and surrounding area when installing suspended ceiling systems.6.
    • Complete the work within the allocated time when installing suspended ceiling systems.7.
    • Comply with the given contract information to install suspended ceiling systems to the required specification.
    7

    Moving, Handling and Storing Resources in the Workplace

    Verified
    Key Learning Objectives:
    • Comply with given information when moving, handling and/or storing resources.
    • Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
    • Maintain safe working practices when moving, handling and/or storing resources.
    • Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
    • Complete the work within the allocated time when moving, handling and/or storing resources.
    • Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.

    Regulatory & Verification Details

    Qualification Number (QN)
    603/0788/2
    Regulated Status
    Available to learners
    Awarding Body
    NOCN
    Qualification Type
    Occupational Qualification
    Operational Start
    Mar 2017