NOCN
    Level 2
    QN: 600/7357/3
    Curriculum Active

    NOCN Level 2 NVQ Certificate in Temporary Traffic Management (Construction)

    Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 227 hours.

    Qualification Level
    Level 2
    Awarding Body
    NOCN
    Syllabus Units
    6 Units
    Guided Hours
    227 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to General Health, Safety and Welfare in the Workplace.

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    2

    Conforming to Productive Working Practices in the Workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.
    • Follow organisational procedures to plan the sequence of work.
    • Maintain relevant records in accordance with the organisational procedures.
    • Maintain good working relationships when conforming to productive working practices.
    3

    Implementing, Monitoring and Removing Mobile Traffic Management on Motorways and Dual Carriageways in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when implementing, monitoring and removing mobile traffic management on motorways and dual carriageways.
    • Know how to comply with relevant legislation and official guidance when implementing, monitoring and removing mobile traffic management on motorways and dual carriageways.
    • Maintain safe and healthy working practices when implementing, monitoring and removing mobile traffic management on motorways and dual carriageways.
    • Select the required quantity and quality of resources for the methods of work to implement
    • monitor and remove mobile traffic management on motorways and dual carriageways., Minimise the risk of damage to the work and surrounding area when implementing, monitoring and removing mobile traffic management on motorways and dual carriageways.
    • Complete the work within the allocated time when implementing, monitoring and removing mobile traffic management on motorways and dual carriageways.
    • Comply with the given contract information to implement
    • monitor and remove mobile traffic management on motorways and dual carriageways to the required specification.
    4

    Installing, Maintaining and Removing Static Temporary Traffic Management on Motorways and High Speed Dual Carriage Ways in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, maintaining and removing static temporary traffic management on motorways and high speed dual carriage ways.
    • Know how to comply with relevant legislation and official guidance when installing, maintaining and removing static temporary traffic management on motorways and high speed dual carriage ways.
    • Maintain safe and healthy working practices when installing, maintaining and removing static temporary traffic management on motorways and high speed dual carriage ways.
    • Select the required quantity and quality of resources for the methods of work to install
    • maintain and remove static temporary traffic management on motorways and high speed dual carriage ways., Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing static temporary traffic management on motorways and high speed dual carriage ways.
    • Complete the work within the allocated time when installing, maintaining and removing static temporary traffic management on motorways and high speed dual carriage ways.
    • Comply with the given contract information to install
    • maintain and remove static temporary traffic management on motorways and high speed dual carriage ways to the required specification.
    5

    Installing, Maintaining and Removing Temporary Traffic Management on Urban and Rural Roads in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, maintaining and removing temporary traffic management on urban and rural roads.
    • Know how to comply with relevant legislation and official guidance when installing, maintaining and removing temporary traffic management on urban and rural roads.
    • Maintain safe and healthy working practices when installing, maintaining and removing temporary traffic management on urban and rural roads.
    • Select the required quantity and quality of resources for the methods of work to install
    • maintain and remove temporary traffic management on urban and rural roads., Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing temporary traffic management on urban and rural roads.
    • Complete the work within the allocated time when installing, maintaining and removing temporary traffic management on urban and rural roads.
    • Comply with the given contract information to install
    • maintain and remove temporary traffic management on urban and rural roads to the required specification.
    6

    Maintaining Temporary Traffic Management Equipment in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when maintaining temporary traffic management equipment.
    • Know how to comply with relevant legislation and official guidance when maintaining temporary traffic management equipment.
    • Maintain safe and healthy working practices when maintaining temporary traffic management equipment.
    • Select the required quantity and quality of resources for the methods of work to maintain temporary traffic management equipment., Minimise the risk of damage to the work and surrounding area when maintaining temporary traffic management equipment.
    • Complete the work within the allocated time when maintaining temporary traffic management equipment.
    • Comply with the given contract information to maintain temporary traffic management equipment, to the required specification.

    Regulatory & Verification Details

    Qualification Number (QN)
    600/7357/3
    Regulated Status
    Available to learners
    Awarding Body
    NOCN
    Qualification Type
    Occupational Qualification
    Operational Start
    Feb 2015