NOCN
    Level 2
    QN: 603/2355/3
    Curriculum Active

    NOCN Level 2 NVQ Diploma in Cladding Occupations (Construction)

    Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 521 hours.

    Qualification Level
    Level 2
    Awarding Body
    NOCN
    Syllabus Units
    13 Units
    Guided Hours
    521 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to General Health, Safety and Welfare in the Workplace.

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    2

    Conforming to Productive Working Practices in the Workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.
    • Follow organisational procedures to plan the sequence of work.
    • Maintain relevant records in accordance with the organisational procedures.
    • Maintain good working relationships when conforming to productive working practices.
    3

    Installing sheeting and cladding rainwater goods on roofs and walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing sheeting and cladding rainwater goods on roofs and walls.
    • Know how to comply with relevant legislation and official guidance when installing sheeting and cladding rainwater goods on roofs and walls.
    • Maintain safe and healthy working practices when installing sheeting and cladding rainwater goods on roofs and walls.
    • Select the required quantity and quality of resources for the methods of work to install sheeting and cladding rainwater goods on roofs and walls., Minimise the risk of damage to the work and surrounding area when installing sheeting and cladding rainwater goods on roofs and walls.
    • Complete the work within the allocated time when installing sheeting and cladding rainwater goods on roofs and walls.
    • Comply with the given contract information to install sheeting and cladding rainwater goods on roofs and walls to the required specification.
    4

    Installing sheeting and cladding systems on roofs and walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing sheeting and cladding systems on roofs and walls.
    • Know how to comply with relevant legislation and official guidance when installing sheeting and cladding systems on roofs and walls.
    • Maintain safe and healthy working practices when installing sheeting and cladding systems on roofs and walls.
    • Select the required quantity and quality of resources for the methods of work to install sheeting and cladding systems on roofs and walls., Minimise the risk of damage to the work and surrounding area when installing sheeting and cladding systems on roofs and walls.
    • Complete the work within the allocated time when installing sheeting and cladding systems on roofs and walls.
    • Comply with the given contract information to install sheeting and cladding systems on roofs and walls to the required specification.
    5

    Installing Solar Collectors to Roofs in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing solar collectors to roofs.
    • Know how to comply with relevant legislation and official guidance when installing solar collectors to roofs.
    • Maintain safe working practices when installing solar collectors to roofs.
    • Select the required quantity and quality of resources for the methods of work to install solar collectors to roofs., Minimise the risk of damage to the work and surrounding area when installing solar collectors to roofs.
    • Complete the work within the allocated time when installing solar collectors to roofs.
    • Comply with the given contract information to installing solar collectors to roofs to the required specification.
    6

    Moving, Handling and Storing Resources in the Workplace

    Verified
    Key Learning Objectives:
    • Comply with given information when moving, handling and/or storing resources.
    • Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
    • Maintain safe working practices when moving, handling and/or storing resources.
    • Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
    • Complete the work within the allocated time when moving, handling and/or storing resources.
    • Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
    7

    Preparing and operating boom-type mobile elevating work platforms - MEWP - in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and using boom-type MEWPs to access areas to carry out the work.
    • Organise with others the sequence and operation in which accessing operations using boom-type MEWPs are to be carried out.
    • Know how to comply with relevant legislation and official guidance when carrying out accessing operations using boom-type MEWPs.
    • Maintain safe and healthy working practices when preparing for and carrying out accessing operations using boom-type MEWPs., Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using boom-type MEWPs., Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas.
    • Complete the work within the allocated time when preparing to and accessing work areas using boom-type MEWPs.
    • Comply with the given contract information to access areas to carry out work using boom-type MEWPs to the required specification.
    8

    Preparing and operating ergonomic manipulating machines to lift and transfer loads in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and use of ergonomic manipulating machines to lift, transfer and place loads.
    • Organise with others the sequence and operation in which lifting operations using ergonomic manipulating machines are to be carried out.
    • Know how to comply with relevant legislation and official guidance when lifting and transferring loads using ergonomic manipulating machines.
    • Maintain safe and healthy working practices when preparing for and carrying out lifting operations using ergonomic manipulating machines., Request and select the required quantity and quality of resources to prepare for and carry out lifting operations using ergonomic manipulating machines., Minimise the risk of damage to the work and surrounding area when preparing to and lifting and transferring loads.
    • Complete the work within the allocated time when preparing to and lifting and transferring loads.
    • Comply with the given contract information to lift, transfer and place loads using ergonomic manipulating machines to the required specification.
    9

    Preparing and operating scissor-type mobile elevating work platforms - MEWP - in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and using scissor-type MEWPs to access areas to carry out the work.
    • Organise with others the sequence and operation in which accessing operations using scissor-type MEWPs are to be carried out.
    • Know how to comply with relevant legislation and official guidance when carrying out accessing operations using scissor-type MEWPs.
    • Maintain safe and healthy working practices when preparing for and carrying out accessing operations using scissor-type MEWPs., Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using scissor-type MEWPs., Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas.
    • Complete the work within the allocated time when preparing to and accessing work areas using scissor-type MEWPs.
    • Comply with the given contract information to access areas to carry out work using scissor-type MEWPs to the required specification.
    10

    Preparing resources for the installation of sheeting and cladding material on roofs and walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing resources for the installation of sheeting and cladding materials on roofs and walls.
    • Know how to comply with relevant legislation and official guidance when preparing resources for the installation of sheeting and cladding materials on roofs and walls.
    • Maintain safe and healthy working practices when preparing resources for the installation of sheeting and cladding materials on roofs and walls.
    • Select the required quantity and quality of resources for the methods of work to prepare resources for the installation of sheeting and cladding materials on roofs and walls., Minimise the risk of damage to the work and surrounding area when preparing resources for the installation of sheeting and cladding materials on roofs and walls.
    • Complete the work within the allocated time when preparing resources for the installation of sheeting and cladding materials on roofs and walls.
    • Comply with the given contract information to prepare resources for the installation of sheeting and cladding materials on roofs and walls.
    11

    Refurbishing sheeting and cladding on roofs, walls or rainscreen systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when refurbishing sheeting and cladding on roofs or walls or rainscreen systems.
    • Know how to comply with relevant legislation and official guidance when refurbishing sheeting and cladding on roofs or walls or rainscreen systems
    • Maintain safe and healthy working practices when refurbishing sheeting and cladding on roofs or walls or rainscreen systems.
    • Select the required quantity and quality of resources for the methods of work to refurbish sheeting and cladding on roofs or walls or rainscreen systems., Minimise the risk of damage to the work and surrounding area when refurbishing sheeting and cladding on roofs or walls or rainscreen systems.
    • Complete the work within the allocated time when refurbishing sheeting and cladding on roofs or walls or rainscreen systems.
    • Comply with the given contract information to refurbish sheeting and cladding on roofs or walls or rainscreen systems to the required specification.
    12

    Repairing sheeting and cladding systems on roofs and walls (including rainscreen) in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when repairing sheeting and cladding systems on roofs and walls, including rainscreen.
    • Know how to comply with relevant legislation and official guidance when repairing sheeting and cladding systems on roofs and walls, including rainscreen.
    • Maintain safe and healthy working practices when repairing sheeting and cladding systems on roofs and walls, including rainscreen.
    • Select the required quantity and quality of resources for the methods of work to repair sheeting and cladding systems on roofs and walls, including rainscreen., Minimise the risk of damage to the work and surrounding area when repairing sheeting and cladding systems on roofs and walls, including rainscreen.
    • Complete the work within the allocated time when repairing sheeting and cladding systems on roofs and walls, including rainscreen.
    • Comply with the given contract information to repair sheeting and cladding systems on roofs and walls, including rainscreen, to the required specification.
    13

    Slinging and hand signalling the movement of suspended loads in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation for and the slinging and signalling of loads.
    • Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out.
    • Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads.
    • Maintain safe and healthy working practices when preparing for and slinging and signalling loads.
    • Select the required quantity and quality of resources to prepare for and when slinging and signalling loads., Minimise the risk of damage to the work and surrounding area when preparing to and slinging and signalling loads.
    • Complete the work within the allocated time when preparing to and slinging and signalling loads.
    • Comply with the given contract information to prepare to and sling and signal suspended loads for movement to the required specification.

    Regulatory & Verification Details

    Qualification Number (QN)
    603/2355/3
    Regulated Status
    Available to learners
    Awarding Body
    NOCN
    Qualification Type
    Occupational Qualification
    Operational Start
    Dec 2017