NOCN
Level 2
QN: 603/3604/3
Curriculum Active
NOCN Level 2 NVQ Diploma in Construction using Off-site Manufactured Assemblies
Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 1447 hours.
Qualification Level
Level 2
Awarding Body
NOCN
Syllabus Units
18 Units
Guided Hours
1447 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Applying Coatings by the Air Spray Method in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when applying coatings by the air spray method.
- Know how to comply with relevant legislation and official guidance when applying coatings by the air spray method.
- Maintain safe and healthy working practices when applying coatings by the air spray method.
- Select the required quantity and quality of resources for the methods of work to apply coatings by the air spray method., Minimise the risk of damage to the work and surrounding area when applying coatings by the air spray method.
- Complete the work within the allocated time when applying coatings by the air spray method.
- Comply with the given contract information to apply coatings by the air spray method to the required specification.
2
Applying Paint Systems by Brush and Roller in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when applying paint systems by brush and/or roller.
- Know how to comply with relevant legislation and official guidance when applying paint systems by brush and/or roller.
- Maintain safe and healthy working practices when applying paint systems by brush and/or roller.
- Select the required quantity and quality of resources for the methods of work to apply paint systems by brush and/or roller., Minimise the risk of damage to the work and surrounding area when applying paint systems by brush and/or roller.
- Complete the work within the allocated time when applying paint systems by brush and/or roller.
- Comply with the given contract information to apply paint systems by brush and/or roller to the required specification.
3
Conforming to General Health, Safety and Welfare in the Workplace.
Verified
Key Learning Objectives:
- Comply with all workplace health, safety and welfare legislation requirements.
- Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
- Comply with organisational policies and procedures to contribute to health, safety and welfare.
- Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
- Comply with and support all organisational security arrangements and approved procedures.
4
Conforming to Productive Working Practices in the Workplace
Verified
Key Learning Objectives:
- Communicate with others to establish productive work practices.
- Follow organisational procedures to plan the sequence of work.
- Maintain relevant records in accordance with the organisational procedures.
- Maintain good working relationships when conforming to productive working practices.
5
Erecting steel frame walls, floors and roofs in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when erecting steel frame walls, floors and roofs.
- Know how to comply with relevant legislation and official guidance when erecting steel frame walls, floors and roofs.
- Maintain safe and healthy working practices when erecting steel frame walls, floors and roofs.
- Select the required quantity and quality of resources for the methods of work to erect steel frame walls, floors and roofs.,Minimise the risk of damage to the work and surrounding area when erecting steel frame walls, floors and roofs.
- Complete the work within the allocated time when erecting steel frame walls, floors and roofs.
- Comply with the given contract information to erect steel frame walls, floors and roofs to the required specification.
6
Finishing dry lining walls and ceilings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when finishing dry lining walls and ceilings.
- Know how to comply with relevant legislation and official guidance when finishing dry lining walls and ceilings.
- Maintain safe working practices when finishing dry lining walls and ceilings.
- Select the required quantity and quality of resources for the methods of work to finish dry lining walls and ceilings., Minimise the risk of damage to the work and surrounding area when finishing dry lining walls and ceilings.
- Complete the work within the allocated time when finishing dry lining walls and ceilings.
- Comply with the given contract information to finish dry lining walls and ceilings to the required specification.
7
Installing Basic Plumbing in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing basic plumbing.
- Know how to comply with relevant legislation and official guidance when installing basic plumbing.
- Maintain safe working practices when installing basic plumbing.
- Select the required quantity and quality of resources for the methods of work to install basic plumbing., Minimise the risk of damage to the work and surrounding area when installing basic plumbing.
- Complete the work within the allocated time when installing basic plumbing.
- Comply with the given contract information to install basic plumbing to the required specification.
8
Installing First Fixing Components in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing first fixing components.
- Know how to comply with relevant legislation and official guidance when installing first fixing components.
- Maintain safe working practices when installing first fixing components.
- Select the required quantity and quality of resources for the methods of work to install first fixing components., Minimise the risk of damage to the work and surrounding area when installing first fixing components.
- Complete the work within the allocated time when installing first fixing components.
- Comply with the given contract information to install first fixing components to the required specification.
9
Installing plasterboard linings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing plasterboard linings.
- Know how to comply with relevant legislation and official guidance when installing plasterboard linings.
- Maintain safe and healthy working practices installing plasterboard linings.
- Select the required quantity and quality of resources for the methods of work to install plasterboard linings., Minimise the risk of damage to the work and surrounding area when installing plasterboard linings.
- Complete the work within the allocated time when installing plasterboard linings.
- Comply with the given contract information to install plasterboard linings to the required specification.
10
Installing supplementary steel frame finishings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing supplementary steel frame finishings.
- Know how to comply with relevant legislation and official guidance when installing supplementary steel frame finishings.
- Maintain safe and healthy working practices when installing supplementary steel frame finishings.
- Select the required quantity and quality of resources for the methods of work to install supplementary steel frame finishings.,Minimise the risk of damage to the work and surrounding area when installing supplementary steel frame finishings.
- Complete the work within the allocated time when installing supplementary steel frame finishings.
- Comply with the given contract information to install supplementary steel frame finishings to the required specification.
11
Installing, dismantling and maintaining modular buildings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, dismantling and maintaining modular buildings.
- Know how to comply with relevant legislation and official guidance when installing, dismantling and maintaining modular buildings.
- Maintain safe and healthy working practices when installing dismantling and maintaining modular buildings.
- Select the required quantity and quality of resources for the methods of work to install, dismantle and maintain modular buildings.,Minimise the risk of damage to the work and surrounding area when installing dismantling and maintaining modular buildings.
- Complete the work within the allocated time when installing dismantling and maintaining modular buildings.
- Comply with the given contract information to install, dismantle and maintain modular buildings to the required specification.
12
Installing, maintaining and decommissioning portable cabins, units and temporary buildings in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, maintaining and decommissioning portable cabins, units and temporary buildings.
- Know how to comply with relevant legislation and official guidance when installing, maintaining and decommissioning portable cabins, units and temporary buildings.
- Maintain safe and healthy working practices when installing, maintaining and decommissioning portable cabins, units and temporary buildings.
- Select the required quantity and quality of resources for the methods of work to install
- maintain and de
- commission portable cabins, units and temporary buildings.,Minimise the risk of damage to the work and surrounding area when installing, maintaining and decommissioning portable cabins, units and temporary buildings.
- Complete the work within the allocated time when installing, maintaining and decommissioning portable cabins, units and temporary buildings.
- Comply with the given contract information to install
- commission portable cabins, units and temporary buildings to the required specification.
13
Maintaining Non-structural Carpentry Work in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when maintaining non-structural carpentry work.
- Know how to comply with relevant legislation and official guidance when maintaining non-structural carpentry work.
- Maintain safe working practices when maintaining non-structural carpentry work.
- Select the required quantity and quality of resources for the methods of work to maintain non-structural carpentry work., Minimise the risk of damage to the work and surrounding area when maintaining non-structural carpentry work.
- Complete the work within the allocated time when maintaining non-structural carpentry work.
- Comply with the given contract information to maintaining non-structural carpentry work to the required specification.
14
Maintaining non-structural or structural components in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when maintaining non-structural or structural components.
- Know how to comply with relevant legislation and official guidance when maintaining non-structural or structural components.
- Maintain safe working practices when maintaining non-structural or structural components.
- Select the required quantity and quality of resources for the methods of work to maintain non-structural or structural components., Minimise the risk of damage to the work and surrounding area when maintaining non-structural or structural components.
- Complete the work within the allocated time when maintaining non-structural or structural components.
- Comply with the given contract information to maintain non-structural or structural components to the required specification.
15
Moving, Handling and Storing Resources in the Workplace
Verified
Key Learning Objectives:
- Comply with given information when moving, handling and/or storing resources.
- Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
- Maintain safe working practices when moving, handling and/or storing resources.
- Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
- Complete the work within the allocated time when moving, handling and/or storing resources.
- Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
16
Preparing and assembling cold formed steel frames in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when assembling cold formed steel frames.
- Know how to comply with relevant legislation and official guidance when assembling cold formed steel frames.
- Maintain safe and healthy working practices when assembling cold formed steel frames.
- Select the required quantity and quality of resources for the methods of work to assemble cold formed steel frames.,Minimise the risk of damage to the work and surrounding area when assembling cold formed steel frames.
- Complete the work within the allocated time when assembling cold formed steel frames.
- Comply with the given contract information to prepare and assemble cold formed steel frames to the required specification.
17
Preparing Surfaces by Abrasive Blast Cleaning in the Workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when preparing surfaces by abrasive blast cleaning.
- Know how to comply with relevant legislation and official guidance when preparing surfaces by abrasive blast cleaning.
- Maintain safe and healthy working practices when preparing surfaces by abrasive blast cleaning.
- Select the required quantity and quality of resources for the methods of work to prepare surfaces by abrasive blast cleaning., Minimise the risk of damage to the work and surrounding area when preparing surfaces by abrasive blast cleaning.
- Complete the work within the allocated time when preparing surfaces by abrasive blast cleaning.
- Comply with the given contract information to prepare surfaces by abrasive blast cleaning to the required specification.
18
Slinging, signalling and the movement of suspended loads in the workplace
Verified
Key Learning Objectives:
- Interpret the information relating to the work and resources.2.
- Organise and work with others, to establish how the task is to be conducted and communicated to team members.3.
- Comply with organisational procedures and official guidance.4.
- Select the required resources for lifting operations.5. Minimise the risk of damage by complying with organisational procedures.6.
- Carry out the work to meet the specification efficiently and safely.7.
- Complete the work within the allocated time.
Regulatory & Verification Details
- Qualification Number (QN)
- 603/3604/3
- Regulated Status
- Available to learners
- Awarding Body
- NOCN
- Qualification Type
- Occupational Qualification
- Operational Start
- Dec 2018