NOCN
Level 2
QN: 603/1279/8
Curriculum Active
NOCN Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction)
Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 1676 hours.
Qualification Level
Level 2
Awarding Body
NOCN
Syllabus Units
32 Units
Guided Hours
1676 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Carrying out chemical and resin grouting and soil injection in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when carrying out chemical and resin grouting and soil injection.
- Know how to comply with relevant legislation and official guidance when carrying out chemical and resin grouting and soil injection.
- Maintain safe and healthy working practices when carrying out chemical and resin grouting and soil injection.
- Select the required quantity and quality of resources for the methods of work to carry out chemical and resin grouting and soil injection.,Minimise the risk of damage to the work and surrounding area when carrying out chemical and resin grouting and soil injection.
- Complete the work within the allocated time when carrying out chemical and resin grouting and soil injection.
- Comply with the given contract information to carry out chemical and resin grouting and soil injection to the required specification.
2
Carrying out structural waterproofing in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when carrying out structural waterproofing.
- Know how to comply with relevant legislation and official guidance when carrying out structural waterproofing.
- Maintain safe and healthy working practices when carrying out structural waterproofing.
- Select the required quantity and quality of resources for the methods of work to carry out structural waterproofing., Minimise the risk of damage to the work and surrounding area when carrying out structural waterproofing.
- Complete the work within the allocated time when carrying out structural waterproofing.
- Comply with the given contract information to carry out structural waterproofing to the required specification.
3
Conforming to General Health, Safety and Welfare in the Workplace.
Verified
Key Learning Objectives:
- Comply with all workplace health, safety and welfare legislation requirements.
- Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
- Comply with organisational policies and procedures to contribute to health, safety and welfare.
- Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
- Comply with and support all organisational security arrangements and approved procedures.
4
Conforming to Productive Working Practices in the Workplace
Verified
Key Learning Objectives:
- Communicate with others to establish productive work practices.
- Follow organisational procedures to plan the sequence of work.
- Maintain relevant records in accordance with the organisational procedures.
- Maintain good working relationships when conforming to productive working practices.
5
Erecting and striking underpinning formwork in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when erecting and striking underpinning form
- Know how to comply with relevant legislation and official guidance when erecting and striking underpinning form
- Maintain safe and healthy working practices when erecting and striking underpinning form
- Select the required quantity and quality of resources for the methods of work to erect and strike underpinning form
- work., Minimise the risk of damage to the work and surrounding area when erecting and striking underpinning form
- Complete the work within the allocated time when erecting and striking underpinning form
- Comply with the given contract information to erect and strike underpinning form
- work to the required specification.
6
Excavating and providing temporary support to pits and trenches in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when excavating and providing temporary support to pits and trenches.
- Know how to comply with relevant legislation and official guidance when excavating and providing temporary support to pits and trenches.
- Maintain safe and healthy working practices when excavating and providing temporary support to pits and trenches.
- Select the required quantity and quality of resources for the methods of work to excavate and provide temporary support to pits and trenches., Minimise the risk of damage to the work and surrounding area when excavating and providing temporary support to pits and trenches.
- Complete the work within the allocated time when excavating and providing temporary support to pits and trenches.
- Comply with the given contract information to excavate and provide temporary support to pits and trenches to the required specification.
7
Excavating for underpinning in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when excavating for underpinning.
- Know how to comply with relevant legislation and official guidance when excavating for underpinning.
- Maintain safe and healthy working practices when excavating for underpinning.
- Select the required quantity and quality of resources for the methods of work to excavate for underpinning., Minimise the risk of damage to the work and surrounding area when excavating for underpinning.
- Complete the work within the allocated time when excavating for underpinning.
- Comply with the given contract information to excavate for underpinning to the required specification.
8
Inspecting and completing user maintenance on plant or machinery in the workplace
Verified
Key Learning Objectives:
- Identify relevant information relating to the work and resources when inspecting and completing user maintenance on plant or machinery.
- Know how to comply with relevant legislation and official guidance when inspecting and completing user maintenance on plant or machinery.
- Maintain safe and healthy working practices when inspecting and completing user maintenance on plant or machinery.
- Select the required quantity and quality of resources for the methods of work to inspect and complete user maintenance on plant or machinery., Minimise the risk of damage to the work and surrounding area when inspecting and completing user maintenance on plant or machinery.
- Complete the work within the allocated time when inspecting and completing user maintenance on plant or machinery.
- Comply with the given contract information to inspect and complete user maintenance on plant or machinery to the required specification.
9
Installing deep well dewatering systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing deep well dewatering systems.
- Know how to comply with relevant legislation and official guidance when installing deep well dewatering systems.
- Maintain safe and healthy working practices when installing deep well dewatering systems.
- Select the required quantity and quality of resources for the methods of work to install deep well dewatering systems., Minimise the risk of damage to the work and surrounding area when installing deep well dewatering systems.
- Complete the work within the allocated time when installing deep well dewatering systems.
- Comply with the given contract information to install deep well dewatering systems to the required specification.
10
Installing dry packing in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing dry packing.
- Know how to comply with relevant legislation and official guidance when installing dry packing.
- Maintain safe working practices when installing dry packing.
- Select the required quantity and quality of resources for the methods of work to install dry packing., Minimise the risk of damage to the work and surrounding area when installing dry packing.
- Complete the work within the allocated time when installing dry packing.
- Comply with the given contract information to install dry packing to the required specification.
11
Installing ejector dewatering systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing ejector dewatering systems.
- Know how to comply with relevant legislation and official guidance when installing ejector dewatering systems.
- Maintain safe and healthy working practices when installing ejector dewatering systems.
- Select the required quantity and quality of resources for the methods of work to install ejector dewatering systems., Minimise the risk of damage to the work and surrounding area when installing ejector dewatering systems.
- Complete the work within the allocated time when installing ejector dewatering systems.
- Comply with the given contract information to install ejector dewatering systems to the required specification.
12
Installing gas membranes in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing gas membranes.
- Know how to comply with relevant legislation and official guidance when installing gas membranes.
- Maintain safe and healthy working practices when installing gas membranes.
- Select the required quantity and quality of resources for the methods of work to install gas membranes., Minimise the risk of damage to the work and surrounding area when installing gas membranes.
- Complete the work within the allocated time when installing gas membranes.
- Comply with the given contract information to install gas membranes to the required specification.
13
Installing mass gravity retaining structures in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing mass gravity retaining structures.
- Know how to comply with relevant legislation and official guidance when installing mass gravity retaining structures.
- Maintain safe and healthy working practices when installing mass gravity retaining structures.
- Select the required quantity and quality of resources for the methods of work to install mass gravity retaining structures., Minimise the risk of damage to the work and surrounding area when installing mass gravity retaining structures.
- Complete the work within the allocated time when installing mass gravity retaining structures.
- Comply with the given contract information to install mass gravity retaining structures to the required specification.
14
Installing piles in areas of restricted access (mini or micro piling) in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing piles in areas of restricted access (micro or mini piling).
- Know how to comply with relevant legislation and official guidance when installing piles in areas of restricted access (micro or mini piling).
- Maintain safe and healthy working practices when installing piles in areas of restricted access (micro or mini piling).
- Select the required quantity and quality of resources for the methods of work to installing piles in areas of restricted access (mini or micro piling)., Minimise the risk of damage to the work and surrounding area when installing piles in areas of restricted access (mini or micro piling).
- Complete the work within the allocated time when installing piles in areas of restricted access (mini or micro piling).
- Comply with the given contract information to install piles in areas of restricted access (mini or micro piling) to the required specification.
15
Installing precast concrete retaining structures in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing precast concrete retaining structures.
- Know how to comply with relevant legislation and official guidance when installing precast concrete retaining structures.
- Maintain safe and healthy working practices when installing precast concrete retaining structures.
- Select the required quantity and quality of resources for the methods of work to install precast concrete retaining structures., Minimise the risk of damage to the work and surrounding area when installing precast concrete retaining structures.
- Complete the work within the allocated time when installing precast concrete retaining structures.
- Comply with the given contract information to install precast concrete retaining structures to the required specification.
16
Installing reinforcement for the formation of soil structures and slopes in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing reinforcement for the formation of soil structures and slopes.
- Know how to comply with relevant legislation and official guidance when installing reinforcement for the formation of soil structures and slopes.
- Maintain safe and healthy working practices when installing reinforcement for the formation of soil structures and slopes.
- Select the required quantity and quality of resources for the methods of work to install reinforcement for the formation of soil structures and slopes., Minimise the risk of damage to the work and surrounding area when installing reinforcement for the formation of soil structures and slopes.
- Complete the work within the allocated time when installing reinforcement for the formation of soil structures and slopes.
- Comply with the given contract information to install reinforcement for the formation of soil structures and slopes to the required specification.
17
Installing reinforcement steel for underpinning in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing reinforcement steel for underpinning.
- Know how to comply with relevant legislation and official guidance when installing reinforcement steel for underpinning.
- Maintain safe and healthy working practices when installing reinforcement steel for underpinning.
- Select the required quantity and quality of resources for the methods of work to install reinforcement steel for underpinning., Minimise the risk of damage to the work and surrounding area when installing reinforcement steel for underpinning.
- Complete the work within the allocated time when installing reinforcement steel for underpinning.
- Comply with the given contract information to install reinforcement steel for underpinning to the required specification.
18
Installing wellpoint dewatering systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing wellpoint dewatering systems.
- Know how to comply with relevant legislation and official guidance when installing wellpoint dewatering systems.
- Maintain safe and healthy working practices when installing wellpoint dewatering systems.
- Select the required quantity and quality of resources for the methods of work to install wellpoint dewatering systems., Minimise the risk of damage to the work and surrounding area when installing wellpoint dewatering systems.
- Complete the work within the allocated time when installing wellpoint dewatering systems.
- Comply with the given contract information to install wellpoint dewatering systems to the required specification.
19
Installing, constructing, maintaining, dismantling and removing temporary works in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, constructing, maintaining, dismantling and removing temporary works.
- Know how to comply with relevant legislation and official guidance when installing, constructing, maintaining, dismantling and removing temporary works.
- Maintain safe and healthy working practices when installing, constructing, maintaining, dismantling and removing temporary works.
- Select the required quantity and quality of resources for the methods of work to install, construct
- maintain, dismantle and remove temporary works., Minimise the risk of damage to the work and surrounding area when installing, constructing, maintaining, dismantling and removing temporary works.
- Complete the work within the allocated time when installing, constructing, maintaining, dismantling and removing temporary works.
- Comply with the given contract information to install, construct
- maintain, dismantle and remove temporary works to the required specification.
20
Installing, maintaining and removing work area protection and safety equipment in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, maintaining and removing work area protection and safety equipment.
- Know how to comply with relevant legislation and official guidance when establishing work area protection and safety.
- Maintain safe and healthy working practices when installing, maintaining and removing work area protection and safety equipment.
- Select the required quantity and quality of resources for the methods of work to install
- maintain and remove work area protection and safety equipment., Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing work area protection and safety equipment.
- Complete the work within the allocated time when installing, maintaining and removing work area protection and safety equipment.
- Comply with the given contract information to install
- maintain and remove work area protection and safety equipment to the required specification.
21
Moving, Handling and Storing Resources in the Workplace
Verified
Key Learning Objectives:
- Comply with given information when moving, handling and/or storing resources.
- Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
- Maintain safe working practices when moving, handling and/or storing resources.
- Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
- Complete the work within the allocated time when moving, handling and/or storing resources.
- Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
22
Placing and compacting concrete in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when placing and compacting concrete.
- Know how to comply with relevant legislation and official guidance when placing and compacting concrete.
- Maintain safe and healthy working practices when placing and compacting concrete.
- Select the required quantity and quality of resources for the methods of work to place and compact concrete., Minimise the risk of damage to the work and surrounding area when placing and compacting concrete.
- Complete the work within the allocated time when placing and compacting concrete.
- Comply with the given contract information to place and compact concrete to the required specification.
23
Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation and use of powered units, tools or pedestrian plant, machinery or equipment.
- Know how to comply with relevant legislation and official guidance to prepare and use powered units, tools or pedestrian plant, machinery or equipment.
- Maintain safe and healthy working practices when preparing for and using powered units, tools or pedestrian plant, machinery or equipment.
- Select the required quantity and quality of resources to prepare for and sustain powered units, tools or pedestrian plant, machinery or equipment., Minimise the risk of damage to the work and surrounding area when preparing to and using powered units, tools or pedestrian plant, machinery or equipment.
- Complete the work within the allocated time when preparing to and usingpowered units, tools or pedestrian plant, machinery or equipment.
- Comply with the given contract information to operate powered units, tools or pedestrian plant, machinery or equipment to the required specification.
24
Preparing surfaces for structural waterproofing in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when preparing surfaces for structural waterproofing.
- Know how to comply with relevant legislation and official guidance when preparing surfaces for structural waterproofing.
- Maintain safe and healthy working practices when preparing surfaces for structural waterproofing.
- Select the required quantity and quality of resources for the methods of work to prepare surfaces for structural waterproofing., Minimise the risk of damage to the work and surrounding area when preparing surfaces for structural waterproofing.
- Complete the work within the allocated time when preparing surfaces for structural waterproofing.
- Comply with the given contract information to prepare surfaces for structural waterproofing to the required specification.
25
Preparing the site for chemical and resin grouting and soil injection in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when preparing the site for chemical and resin grouting and soil injection.
- Know how to comply with relevant legislation and official guidance when preparing the site for chemical and resin grouting and soil injection.
- Maintain safe and healthy working practices when preparing the site for chemical and resin grouting and soil injection.
- Select the required quantity and quality of resources for the methods of work to prepare the site for chemical and resin grouting and soil injection.,Minimise the risk of damage to the work and surrounding area when preparing the site for chemical and resin grouting and soil injection.
- Complete the work within the allocated time when preparing the site for chemical and resin grouting and soil injection.
- Comply with the given contract information to prepare the site for chemical and resin grouting and soil injection to the required specification.
26
Preparing the site for the installation of dewatering systems in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when preparing the site for the installation of dewatering systems.
- Know how to comply with relevant legislation and official guidance when preparing the site for the installation of dewatering systems.
- Maintain safe and healthy working practices when preparing the site for the installation of dewatering systems.
- Select the required quantity and quality of resources for the methods of work to prepare the site for the installation of dewatering systems., Minimise the risk of damage to the work and surrounding area when preparing the site for the installation of dewatering systems.
- Complete the work within the allocated time when preparing the site for the installation of dewatering systems.
- Comply with the given contract information to prepare the site for the installation of dewatering systems to the required specification.
27
Preparing to install gas membranes in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when preparing to install gas membranes.
- Know how to comply with relevant legislation and official guidance when preparing to install gas membranes.
- Maintain safe and healthy working practices when preparing to install gas membranes.
- Select the required quantity and quality of resources for the methods of work to prepare to install gas membranes., Minimise the risk of damage to the work and surrounding area when preparing to install gas membranes.
- Complete the work within the allocated time when preparing to install gas membranes.
- Comply with the given contract information to prepare to install gas membranes to the required specification.
28
Repairing sub-structure after underpinning in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when repairing sub-structure after underpinning.
- Know how to comply with relevant legislation and official guidance when repairing sub-structure after underpinning.
- Maintain safe and healthy working practices when repairing sub-structure after underpinning.
- Select the required quantity and quality of resources for the methods of work to repair sub-structure after underpinning., Minimise the risk of damage to the work and surrounding area when repairing sub-structure after underpinning.
- Complete the work within the allocated time when repairing sub-structure after underpinning.
- Comply with the given contract information to repair sub-structure after underpinning to the required specification.
29
Setting out and marking positions for underpinning sequence in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when setting out and marking positions for underpinning sequence.
- Know how to comply with relevant legislation and official guidance when setting out and marking positions for underpinning sequence.
- Maintain safe and healthy working practices when setting out and marking positions for underpinning sequence.
- Select the required quantity and quality of resources for the methods of work to set out and mark positions for underpinning sequence., Minimise the risk of damage to the work and surrounding area when setting out and marking positions for underpinning sequence.
- Complete the work within the allocated time when setting out and marking positions for underpinning sequence.
- Comply with the given contract information to set out and mark positions for underpinning sequence to the required specification.
30
Setting out secondary dimensional work control in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to setting out dimensional control of the work.
- Know how to comply with relevant legislation and official guidance to set out dimensional control of the work.
- Maintain safe and healthy working practices when setting out dimensional control of the work.
- Select the required quantity and quality of resources to set out dimensional control of the work., Minimise the risk of damage to the work and surrounding area when setting out dimensional control of the work.
- Complete the work within the allocated time when setting out dimensional control of the work.
- Comply with the given contract information to set out dimensional control of the work to the required specification.
31
Slinging and hand signalling the movement of suspended loads in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the preparation for and the slinging and signalling of loads.
- Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out.
- Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads.
- Maintain safe and healthy working practices when preparing for and slinging and signalling loads.
- Select the required quantity and quality of resources to prepare for and when slinging and signalling loads., Minimise the risk of damage to the work and surrounding area when preparing to and slinging and signalling loads.
- Complete the work within the allocated time when preparing to and slinging and signalling loads.
- Comply with the given contract information to prepare to and sling and signal suspended loads for movement to the required specification.
32
Stabilising steep slopes in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when stabilising steep slopes.
- Know how to comply with relevant legislation and official guidance when stabilising steep slopes.
- Maintain safe and healthy working practices when stabilising steep slopes.
- Select the required quantity and quality of resources for the methods of work to stabilise steep slopes., Minimise the risk of damage to the work and surrounding area when stabilising steep slopes.
- Complete the work within the allocated time when stabilising steep slopes.
- Comply with the given contract information to stabilise steep slopes to the required specification.
Regulatory & Verification Details
- Qualification Number (QN)
- 603/1279/8
- Regulated Status
- Available to learners
- Awarding Body
- NOCN
- Qualification Type
- Occupational Qualification
- Operational Start
- Jun 2017