NOCN
Level 3
QN: 603/7475/5
Curriculum Active
NOCN Level 3 NVQ Diploma in Demolition (Construction)
Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 1880 hours.
Qualification Level
Level 3
Awarding Body
NOCN
Syllabus Units
16 Units
Guided Hours
1880 hrs
Instant access to interactive lessons, quizzes, and spaced revision.
Course Syllabus & Study Modules
Complete breakdown of verified curriculum topics and learning objectives.
1
Co-ordinating and confirming the dimensional control requirements of the work in the workplace
Verified
Key Learning Objectives:
- Co-ordinate with and communicate the dimensional control information to work colleagues.
- Confirm and measure the dimensional controls and maintain them to the specified work requirements.
- Check and ensure measuring and recording equipment meets the specified tolerances.
- Identify any deviations in dimensional controls and ensure they are corrected in accordance with work requirements.
2
Co-ordinating and organising work operations in the workplace
Verified
Key Learning Objectives:
- Provide information as required, to all the people who will be affected by the work.
- Agree the planned timescales and methods of work with the workforce.
- Implement the agreed methods of communicating, reporting, recording and retrieving information.
- Identify any breakdowns in communication and take action to restore effective communication.
- Communicate and organise the work being done with other operations as per the agreed work programme.
- Organise and ensure there are sufficient resources, of the appropriate type, to meet the project requirements and timescales.
- Organise and control the work and resources so that conditions are safe and the workplace is tidy.
- Identify and record any unplanned circumstances and pass them on to people who may be affected.
- Organise the designated work area for operational purposes and communicate to the workforce.
- Organise the storage and use of materials and equipment so that handling and movement is efficient and wastage is minimised.
3
Confirming the Occupational Method of Work in the Workplace
Verified
Key Learning Objectives:
- Assess available project data accurately to determine the occupational method of work., Obtain additional information from alternative sources in cases where the available project data is insufficient.
- Identify work methods that will make best use of resources and meet project, statutory and contractual requirements., Confirm and communicate the selected work method to relevant personnel.
4
Confirming Work Activities and Resources for an Occupational Work Area in the Workplace
Verified
Key Learning Objectives:
- Identify work activities
- assess required resources and plan the sequence of work., Obtain clarification and advice where the resources required are not available.
- Evaluate the work activities and the requirements of any significant external factors against the project requirements.
- Identify work activities which influence each other and make the best use of theresources available.
- Identify changed circumstances that require alterations to the work programme and justify them to decision makers.
5
Controlling, directing and guiding the operation of plant or machinery in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating tocontrolling, directing and guiding the operation of plant or machinery.
- Organise with others the sequence and operation in which directing and guiding operations are to be carried out.
- Know how to comply with relevant legislation and official guidance when carrying out controlling,directing and guiding operations of plant or machinery.
- Maintain safe and healthy working practices when controlling, directing and guiding the operation of plant and machinery.
- Select the required quantity and quality of resources to direct and guide the operation of plant and machinery., Minimise the risk of damage to the work and surrounding area when controlling, directing and guiding the operation of plant and machinery.
- Complete the work within the allocated time when controlling, directing and guiding the operation of plant and machinery.
- Comply with the given contract information to control, direct and guide the operation of plant or machinery to the required specification.
6
Developing and maintaining good occupational working relationships in the workplace
Verified
Key Learning Objectives:
- maintain and encourage working relationships to promote good will and trust.2. Inform relevant people about work activities in an appropriate level of detail, with the appropriate level of urgency.3. Offer advice and help to relevant people about work activities and encourage questions/requests for clarification and comments.4. Clarify proposals with relevant people and discuss alternative suggestions.5. Re
- solve differences of opinion in ways that minimise offence and maintain goodwill, trust and respect.
7
Dismantling and/or demolishing masonry and/or concrete structures in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when dismantling and/or demolishing masonry and/or concrete structures.2.
- Know how to comply with relevant legislation and official guidance when dismantling and/or demolishing masonry and/or concrete structures.3.
- Maintain safe and healthy working practices when dismantling and/or demolishing masonry and/or concrete structures.4.
- Select the required quantity and quality of resources for the methods of work to dismantle and/or demolish masonry and/or concrete structures.5. Minimise the risk of damage to the work and surrounding area when dismantling and/or demolishing masonry and/or concrete structures.6.
- Complete the work within the allocated time when dismantling and/or demolishing masonry and/or concrete structures.7.
- Comply with the given contract information to dismantle and/or demolish masonry and/or concrete structures, to the required specification.
8
Dismantling and/or demolishing metal structures in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when dismantling and/or demolishing metal structures.2.
- Know how to comply with relevant legislation and official guidance when dismantling and/or demolishing metal structures.3.
- Maintain safe and healthy working practices when dismantling and/or demolishing metal structures.4.
- Select the required quantity and quality of resources for the methods of work to dismantle and/or demolish metal structures.5. Minimise the risk of damage to the work and surrounding area when dismantling and/or demolishing metal structures.6.
- Complete the work within the allocated time when dismantling and/or demolishing metal structures.7.
- Comply with the given contract information to dismantle and/or demolish metal structures, to the required specification.
9
Dismantling and/or demolishing roofs and/or cladding in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when dismantling and/or demolishing roofs and/or cladding.2.
- Know how to comply with relevant legislation and official guidance when dismantling and/or demolishing roofs and/or cladding.3.
- Maintain safe and healthy working practices when dismantling and/or demolishing roofs and/or cladding.4.
- Select the required quantity and quality of resources for the methods of work to dismantle and/or demolish roofs and/or cladding.5. Minimise the risk of damage to the work and surrounding area when dismantling and/or demolishing roofs and/or cladding.6.
- Complete the work within the allocated time when dismantling and/or demolishing roofs and/or cladding.7.
- Comply with the given contract information to dismantle and/or demolish roofs and/or cladding, to the required specification.
10
Dismantling and/or demolishing timber structures in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when dismantling and/or demolishing timber structures.2.
- Know how to comply with relevant legislation and official guidance when dismantling and/or demolishing timber structures.3.
- Maintain safe and healthy working practices when dismantling and/or demolishing timber structures.4.
- Select the required quantity and quality of resources for the methods of work to dismantle and/or demolish timber structures.5. Minimise the risk of damage to the work and surrounding area when dismantling and/or demolishing timber structures.6.
- Complete the work within the allocated time when dismantling and/or demolishing timber structures.7.
- Comply with the given contract information to dismantle and/or demolish timber structures to the required specification.
11
Implementing and maintaining health, safety, environmental and welfare practices in the workplace
Verified
Key Learning Objectives:
- Allocate and maintain health, safety, environmental and welfare equipment and resources to meet project and statutory requirements.
- Encourage a positive culture of health, safety, environmental and welfare practices and identify opportunities for improving the health and safety of the work environment through engagement with the workforce.
- Ensure that their team is inducted and check that they are suitably competent and monitored whilst at the workplace.
- Monitor and review health, safety, environmental and welfare practices and safe systems of work in the relevant work environment in accordance with current organisational and statutory requirements.
12
Installing, constructing, maintaining, dismantling and removing temporary works in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when installing, constructing, maintaining, dismantling and removing temporary works.
- Know how to comply with relevant legislation and official guidance when installing, constructing, maintaining, dismantling and removing temporary works.
- Maintain safe and healthy working practices when installing, constructing, maintaining, dismantling and removing temporary works.
- Select the required quantity and quality of resources for the methods of work to install, construct
- maintain, dismantle and remove temporary works., Minimise the risk of damage to the work and surrounding area when installing, constructing, maintaining, dismantling and removing temporary works.
- Complete the work within the allocated time when installing, constructing, maintaining, dismantling and removing temporary works.
- Comply with the given contract information to install, construct
- maintain, dismantle and remove temporary works to the required specification.
13
Monitoring progress of work against schedules in the workplace
Verified
Key Learning Objectives:
- Monitor progress of planned programmes against work schedules.
- record and report inappropriate specified resources and suggest suitable alternatives.
- Identify and quantify deviations from planned progress which have or may occur, and which could alter the programme.
- Confirm the circumstances of any deviations, seek advice and implement appropriate corrective actions.
- Identify and report options which may help the contract progress.
- Report progress, any changes to the operational programme and resource needs.
14
Operating plant or machinery to dismantle and/or demolish structures above 30 metres in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when operating plant or machinery to dismantle and/or demolish structures above 30 metres.2.
- Organise with others the sequence and operation in which demolition operations using plant or machinery to dismantle and/or demolish structures above 30 metres are to be carried out.3.
- Know how to comply with relevant legislation and official guidance to carry out demolition operations when operating plant or machinery to dismantle and/or demolish structures above 30 metres.4.
- Maintain safe and healthy working practices when operating plant or machinery to dismantle and/or demolish structures above 30 metres.5. Request and select the required quantity and quality of resources for the methods of work to operate plant or machinery to dismantle and/or demolish structures above 30 metres.
- Minimise the risk of damage to the work and surrounding area when operating plant or machinery to dismantle and /or demolish structures above 30 metres.7.
- Complete the work within the allocated time when operating plant or machinery to dismantle and/or demolish structures above 30 metres.8.
- Comply with the given contract information to operate plant or machinery to dismantle and/or demolish structures above 30 metres to the required specification.
15
Operating plant or machinery to dismantle and/or demolish structures up to 30 metres in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when operating plant or machinery to dismantle and/or demolish structures up to 30 metres.2.
- Organise with others the sequence and operation in which demolition operations using plant or machinery to dismantle and/or demolish structures up to 30 metres are to be carried out.3.
- Know how to comply with relevant legislation and official guidance to carry out demolition operations when operating plant or machinery to dismantle and/or demolish structures up to 30 metres.4.
- Maintain safe and healthy working practices when operating plant or machinery to dismantle and/or demolish structures up to 30 metres.5. Request and select the required quantity and quality of resources for the methods of work to operate plant or machinery to dismantle and/or demolish structures up to 30 metres.6. Minimise the risk of damage to the work and surrounding area when operating plant or machinery to dismantle and /or demolish structures up to 30 metres.7.
- Complete the work within the allocated time when operating plant or machinery to dismantle and/or demolish structures up to 30 metres.8.
- Comply with the given contract information to operate plant or machinery to dismantle and/or demolish structures up to 30 metres to the required specification.
16
Removing and segregating components and materials in demolition and/or refurbishment in the workplace
Verified
Key Learning Objectives:
- Interpret the given information relating to the work and resources when removing and segregating components and materials in demolition and/or refurbishment.2.
- Know how to comply with relevant legislation and official guidance when removing and segregating components and materials in demolition and/or refurbishment.3.
- Maintain safe and healthy working practices when removing and segregating components and materials in demolition and/or refurbishment.4.
- Select the required quantity and quality of resources for the methods of work to remove and segregate components and materials in demolition and/or refurbishment.5. Minimise the risk of damage to the work and surrounding area when removing and segregating components and materials in demolition and/or refurbishment.6.
- Complete the work within the allocated time when removing and segregating components and materials in demolition and/or refurbishment.7.
- Comply with the given contract information to remove and segregate components and materials in demolition and/or refurbishment to the required specification.
Regulatory & Verification Details
- Qualification Number (QN)
- 603/7475/5
- Regulated Status
- Available to learners
- Awarding Body
- NOCN
- Qualification Type
- Occupational Qualification
- Operational Start
- Jul 2021