NOCN
    Level 3
    QN: 603/7207/2
    Curriculum Active

    NOCN Level 3 NVQ Diploma in Insulation and Building Treatments (Construction)

    Official qualification regulated by Ofqual, awarded by NOCN. Classified as a Occupational Qualification. Total guided learning hours: 1701 hours.

    Qualification Level
    Level 3
    Awarding Body
    NOCN
    Syllabus Units
    20 Units
    Guided Hours
    1701 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Applying surface finishes to external wall insulation in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when applying surface finishes to external wall insulation.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when applying surface finishes to external wall insulation.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices when applying surface finishes to external wall insulation.4.
    • Select the required quantity and quality of resources for the methods of work to apply surface finishes to external wall insulation.5. Minimise the risk of damage to the work and surrounding area when applying surface finishes to external wall insulation.6.
    • Complete the work within the allocated time when applying surface finishes to external wall insulation.7.
    • Comply with the given contract information to carry out the work efficiently when applying surface finishes to external wall insulation to the required specification.
    2

    Confirming the Occupational Method of Work in the Workplace

    Verified
    Key Learning Objectives:
    • Assess available project data accurately to determine the occupational method of work., Obtain additional information from alternative sources in cases where the available project data is insufficient.
    • Identify work methods that will make best use of resources and meet project, statutory and contractual requirements., Confirm and communicate the selected work method to relevant personnel.
    3

    Confirming Work Activities and Resources for an Occupational Work Area in the Workplace

    Verified
    Key Learning Objectives:
    • Identify work activities
    • assess required resources and plan the sequence of work., Obtain clarification and advice where the resources required are not available.
    • Evaluate the work activities and the requirements of any significant external factors against the project requirements.
    • Identify work activities which influence each other and make the best use of theresources available.
    • Identify changed circumstances that require alterations to the work programme and justify them to decision makers.
    4

    Conforming to General Health, Safety and Welfare in the Workplace.

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    5

    Develop customer relationships

    Verified
    Key Learning Objectives:
    • build their customer’s confidence that the service they give will be excellent, meet the expectations of their customers
    • develop the long-term relationship between their customer and their organisation
    • know how to develop customer relationships
    6

    Developing and maintaining good occupational working relationships in the workplace

    Verified
    Key Learning Objectives:
    • maintain and encourage working relationships to promote good will and trust.2. Inform relevant people about work activities in an appropriate level of detail, with the appropriate level of urgency.3. Offer advice and help to relevant people about work activities and encourage questions/requests for clarification and comments.4. Clarify proposals with relevant people and discuss alternative suggestions.5. Re
    • solve differences of opinion in ways that minimise offence and maintain goodwill, trust and respect.
    7

    Erecting and Dismantling Access/Working Platforms in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when erecting and dismantling access/working platforms.
    • Know how to comply with relevant legislation and official guidance when erecting and dismantling access/working platforms.
    • Maintain safe working practices when erecting and dismantling access/working platforms.
    • Select the required quantity and quality of resources for the methods of work to erect and dismantle access/working platforms., Minimise the risk of damage to the work and surrounding area when erecting and dismantling access/working platforms.
    • Complete the work within the allocated time when erecting and dismantling access/working platforms.
    • Comply with the given contract information to erect and dismantle access/ working platforms to the required specification.
    8

    Injecting, blowing and spraying insulation to internal walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when injecting, blowing and spraying insulation to internal walls.2.
    • Know how to comply with environmentally responsible work practices to meet current legislation standards and official guidance when injecting, blowing and spraying insulation to internal walls.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to inject, blow and spray insulation to internal walls.5. Minimise the risk of damage to the work and surrounding area when injecting, blowing and spraying insulation to internal walls.6.
    • Complete the work within the allocated time when injecting, blowing and spraying insulation to internal walls.7.
    • Comply with the given contract information to carry out the work efficiently to inject, blow and spray insulation to internal walls to the required specification.
    9

    Injecting, blowing or spraying insulation to framed sections of buildings in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when injecting, blowing or spraying insulation to framed sections of buildings.2.
    • Know how to comply with environmentally responsible work practices to meet current legislation standards and official guidance when injecting, blowing or spraying insulation to framed sections of buildings.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to inject, blow or spray insulation to framed sections of buildings.5. Minimise the risk of damage to the work and surrounding area when injecting, blowing or spraying insulation to framed sections of buildings.6.
    • Complete the work within the allocated time when injecting, blowing or spraying insulation to framed sections of buildings.7.
    • Comply with the given contract information to carry out the work efficiently to inject, blow or spray insulation to framed sections of buildings to the required specification.
    10

    Installing blown insulation to cold roofs in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing blown insulation to cold roofs.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing blown insulation to cold roofs.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.
    • Select the required quantity and quality of resources for the methods of work to install blown insulation to cold roofs.5. Minimise the risk of damage to the work and surrounding area when installing blown insulation to cold roofs.6.
    • Complete the work within the allocated time when installing blown insulation to cold roofs.7.
    • Comply with the given contract information to carry out the work efficiently to install blown insulation to cold roofs to the required specification.
    11

    Installing external wall insulation in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing external wall insulation.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing external wall insulation.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install external wall insulation.5. Minimise the risk of damage to the work and surrounding area when installing external wall insulation.6.
    • Complete the work within the allocated time when installing external wall insulation.7.
    • Comply with the given contract information to carry out the work efficiently to install external wall insulation to the required specification.
    12

    Installing insulation to cold roofs in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing insulation to cold roofs.2.
    • Know how to comply with environmentally responsible work practices to meet current legislation standards and official guidance when installing insulation to cold roofs.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install insulation to cold roofs.5. Minimise the risk of damage to the work and surrounding area when installing insulation to cold roofs.6.
    • Complete the work within the allocated time when installing insulation to cold roofs.7.
    • Comply with the given contract information to carry out the work efficiently to install insulation to cold roofs to the required specification.
    13

    Installing insulation to create warm roofs in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing insulation to create warm roofs in the workplace.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing insulation to create warm roofs.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install insulation to create warm roofs.5. Minimise the risk of damage to the work and surrounding area when installing insulation to create warm roofs.6.
    • Complete the work within the allocated time when installing insulation to create warm roofs.7.
    • Comply with the given contract information to carry out the work efficiently to install insulation to create warm roofs to the required specification.
    14

    Installing insulation to framed sections of buildings in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing insulation to framed sections of buildings.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing insulation to framed sections of buildings.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install insulation to framed sections of buildings.5. Minimise the risk of damage to the work and surrounding area when installing insulation to framed sections of buildings.6.
    • Complete the work within the allocated time when installing insulation to framed sections of buildings.7.
    • Comply with the given contract information to carry out the work efficiently to install insulation to framed sections of buildings to the required specification.
    15

    Installing insulation to suspended floors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing insulation to suspended floors.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing insulation to suspended floors.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install insulation to suspended floors.5. Minimise the risk of damage to the work and surrounding area when installing insulation to suspended floors.6.
    • Complete the work within the allocated time when installing insulation to suspended floors.7.
    • Comply with the given contract information to carry out the work efficiently to install insulation to suspended floors to the required specification.
    16

    Installing internal insulation to walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when installing internal insulation to walls.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when installing internal insulation to walls.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to install internal insulation to walls.5. Minimise the risk of damage to the work and surrounding area when installing internal insulation to walls.6.
    • Complete the work within the allocated time when installing internal insulation to walls.7.
    • Comply with the given contract information to carry out the work efficiently to install internal insulation to walls, to the required specification.
    17

    Insulation and Building Treatments, Building Construction, Defects and Interfaces

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources and identify its suitability, taking into consideration building type, defects and detailing and recording and reporting issues in regard to building construction, defects and interfaces.2.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices as stated for each measure to be installed.
    • Select the required quantity and quality of resources for the methods of work in relation to building construction, defects and interfaces.4. Minimise the risk of damage to the work and surrounding area in relation to building construction, defects and interfaces.5.
    • Comply with the given contract information when identifying common building construction, defects and interfaces to the required specification.
    18

    Park homes insulation

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when reviewing the suitability of Park Homes for insulation measures.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when reviewing the suitability of Park Homes for insulation measures.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.
    • Select the required quantity and quality of resources as per the designs for the methods of work when reviewing the suitability of Park Homes for insulation measures.5. Minimise the risk of damage to the work and surrounding area when reviewing the suitability of Park Homes for insulation measures.6.
    • Complete the work within the allocated time when reviewing the suitability of Park Homes for insulation measures.7.
    • Comply with the given contract information to carry out the work efficiently when reviewing the suitability of Park Homes for insulation measures to the required specification.
    19

    Spraying insulation to create warm roofs in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when spraying insulation to create warm roofs.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when spraying insulation to create warm roofs.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to spray insulation to create warm roofs.5. Minimise the risk of damage to the work and surrounding area when spraying insulation to create warm roofs.6.
    • Complete the work within the allocated time when spraying insulation to create warm roofs.7.
    • Comply with the given contract information to carry out the work efficiently to spray insulation to create warm roofs to the required specification.
    20

    Spraying insulation to suspended floors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given design information relating to the work and resources to confirm its accuracy, completeness and relevance to the building type, fabric and condition when spraying insulation to suspended floors.2.
    • Know how to comply with environmentally responsible work practices to meet current, legislation standards and official guidance when spraying insulation to suspended floors.3.
    • Comply with current, relevant legislation, standards and official guidance to carry out your work and maintain safe and healthy work practices.4.
    • Select the required quantity and quality of resources for the methods of work to spray insulation to suspended floors.5. Minimise the risk of damage to the work and surrounding area when spraying insulation to suspended floors.6.
    • Complete the work within the allocated time when spraying insulation to suspended floors.7.
    • Comply with the given contract information to carry out the work efficiently to spray insulation to suspended floors to the required specification.

    Regulatory & Verification Details

    Qualification Number (QN)
    603/7207/2
    Regulated Status
    Available to learners
    Awarding Body
    NOCN
    Qualification Type
    Occupational Qualification
    Operational Start
    Jun 2021