ProQual
    Level 2
    QN: 603/3412/5
    Curriculum Active

    ProQual Level 2 NVQ Certificate in Construction using Off-site Manufactured Assemblies (Construction)

    Official qualification regulated by Ofqual, awarded by ProQual. Classified as a Occupational Qualification. Total guided learning hours: 645 hours.

    Qualification Level
    Level 2
    Awarding Body
    ProQual
    Syllabus Units
    12 Units
    Guided Hours
    645 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Conforming to General Health, Safety and Welfare in the Workplace

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    2

    Conforming to Productive Working Practices in the Workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.
    • Follow organisational procedures to plan the sequence of work.
    • Maintain relevant records in accordance with the organisational procedures.
    • Maintain good working relationships when conforming to productive working practices.
    3

    Erecting precast concrete cladding units in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when erecting precast concrete cladding units
    • Know how to comply with relevant legislation and official guidance when erecting precast concrete cladding units
    • Maintain safe working practices when erecting precast concrete cladding units
    • Select the required quantity and quality of resources for the methods of work to erect precast concrete cladding units, Minimise the risk of damage to the work and surrounding area when erecting precast concrete cladding units
    • Complete the work within the allocated time when erecting precast concrete cladding units
    • Comply with the given contract information to erect precast concrete cladding units to the required specification
    4

    Erecting precast concrete flooring units in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when erecting precast concrete flooring units
    • Know how to comply with relevant legislation and official guidance when erecting precast concrete flooring units
    • Select the required quantity and quality of resources for the methods of work to erect precast concrete flooring units, Minimise the risk of damage to the work and surrounding area when erecting precast concrete flooring units
    • Complete the work within the allocated time when erecting precast concrete flooring units
    • Comply with the given contract information to erect precast concrete flooring units to the required specification
    5

    Installing sheeting and cladding systems on roofs and walls in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing sheeting and cladding systems on roofs and walls
    • Know how to comply with relevant legislation and official guidance when installing sheeting and cladding systems on roofs and walls
    • Maintain safe and healthy working practices when installing sheeting and cladding systems on roofs and walls
    • Select the required quantity and quality of resources for the methods of work to install sheeting and cladding systems on roofs and walls, Minimise the risk of damage to the work and surrounding area when installing sheeting and cladding systems on roofs and walls
    • Complete the work within the allocated time when installing sheeting and cladding systems on roofs and walls
    • Comply with the given contract information to install sheeting and cladding systems on roofs and walls to the required specification
    6

    Moving, handling and storing resources in the workplace

    Verified
    Key Learning Objectives:
    • Comply with given information when moving, handling and/or storing resources.
    • Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
    • Maintain safe working practices when moving, handling and/or storing resources.
    • Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources.Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
    • Complete the work within the allocated time when moving, handling and/or storing resources.
    • Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
    7

    Preparing and assembling cold formed steel frames in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when assembling cold formed steel frames
    • Know how to comply with relevant legislation and official guidance when assembling cold formed steel frames
    • Maintain safe and healthy working practices when assembling cold formed steel frames
    • Select the required quantity and quality of resources for the methods of work to assemble cold formed steel frames, Minimise the risk of damage to the work and surrounding area when assembling cold formed steel frames
    • Complete the work within the allocated time when assembling cold formed steel frames
    • Comply with the given contract information to prepare and assemble cold formed steel frames to the required specification
    8

    Preparing and operating boom-type mobile elevating work platforms - MEWP - in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and using boom-type MEWPs to access areas to carry out the work.
    • Organise with others the sequence and operation in which accessing operations using boom-type MEWPs are to be carried out.
    • Know how to comply with relevant legislation and official guidance when carrying out accessing operations using boom-type MEWPs.
    • Maintain safe and healthy working practices when preparing for and carrying out accessing operations using boom-type MEWPs., Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using boom-type MEWPs., Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas.
    • Complete the work within the allocated time when preparing to and accessing work areas using boom-type MEWPs.
    • Comply with the given contract information to access areas to carry out work using boom-type MEWPs to the required specification.
    9

    Preparing and operating scissor-type mobile elevating work platforms - MEWP - in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the preparation and using scissor-type MEWPs to access areas to carry out the work.
    • Organise with others the sequence and operation in which accessing operations using scissor-type MEWPs are to be carried out.
    • Know how to comply with relevant legislation and official guidance when carrying out accessing operations using scissor-type MEWPs.
    • Maintain safe and healthy working practices when preparing for and carrying out accessing operations using scissor-type MEWPs., Request and select the required quantity and quality of resources to prepare for and carry out accessing operations using scissor-type MEWPs., Minimise the risk of damage to the work and surrounding area when preparing to and accessing work areas.
    • Complete the work within the allocated time when preparing to and accessing work areas using scissor-type MEWPs.
    • Comply with the given contract information to access areas to carry out work using scissor-type MEWPs to the required specification.
    10

    Preparing backing walls to receive rainscreen wall cladding systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing backing walls to receive rainscreen wall cladding systems
    • Know how to comply with relevant legislation and official guidance when preparing backing walls to receive rainscreen wall cladding systems
    • Maintain safe and healthy working practices when preparing backing walls to receive rainscreen wall cladding systems
    • Select the required quantity and quality of resources for the methods of work to prepare backing walls to receive rainscreen wall cladding systems, Minimise the risk of damage to the work and surrounding area when preparing backing walls to receive rainscreen wall cladding systems
    • Complete the work within the allocated time when preparing backing walls to receive rainscreen wall cladding systems
    • Comply with the given contract information to prepare backing walls to receive rainscreen wall cladding systems to the required specification

    Regulatory & Verification Details

    Qualification Number (QN)
    603/3412/5
    Regulated Status
    Available to learners
    Awarding Body
    ProQual
    Qualification Type
    Occupational Qualification
    Operational Start
    Jul 2018