ProQual
    Level 2
    QN: 603/1144/7
    Curriculum Active

    ProQual Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction)

    Official qualification regulated by Ofqual, awarded by ProQual. Classified as a Occupational Qualification. Total guided learning hours: 1891 hours.

    Qualification Level
    Level 2
    Awarding Body
    ProQual
    Syllabus Units
    35 Units
    Guided Hours
    1891 hrs
    Instant access to interactive lessons, quizzes, and spaced revision.

    Course Syllabus & Study Modules

    Complete breakdown of verified curriculum topics and learning objectives.

    1

    Carrying out chemical and resin grouting and soil injection in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when carrying out chemical and resin grouting and soil injection
    • Know how to comply with relevant legislation and official guidance when carrying out chemical and resin grouting and soil injection
    • Maintain safe and healthy working practices when carrying out chemical and resin grouting and soil injection
    • Select the required quantity and quality of resources for the methods of work to carry out chemical and resin grouting and soil injection, Minimise the risk of damage to the work and surrounding area when carrying out chemical and resin grouting and soil injection
    • Complete the work within the allocated time when carrying out chemical and resin grouting and soil injection
    • Comply with the given contract information to carry out chemical and resin grouting and soil injection to the required specification
    2

    Conforming to General Health, Safety and Welfare in the Workplace

    Verified
    Key Learning Objectives:
    • Comply with all workplace health, safety and welfare legislation requirements.
    • Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures.
    • Comply with organisational policies and procedures to contribute to health, safety and welfare.
    • Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area.
    • Comply with and support all organisational security arrangements and approved procedures.
    3

    Conforming to Productive Working Practices in the Workplace

    Verified
    Key Learning Objectives:
    • Communicate with others to establish productive work practices.
    • Follow organisational procedures to plan the sequence of work.
    • Maintain relevant records in accordance with the organisational procedures.
    • Maintain good working relationships when conforming to productive working practices.
    4

    Erecting and striking underpinning formwork in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when erecting and striking underpinning form
    • Know how to comply with relevant legislation and official guidance when erecting and striking underpinning form
    • Maintain safe and healthy working practices when erecting and striking underpinning form
    • Select the required quantity and quality of resources for the methods of work to erect and strike underpinning form
    • work, Minimise the risk of damage to the work and surrounding area when erecting and striking underpinning form
    • Complete the work within the allocated time when erecting and striking underpinning form
    • Comply with the given contract information to erect and strike underpinning form
    • work to the required specification
    5

    Excavating and providing temporary support to pits and trenches in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when excavating and providing temporary support to pits and trenches
    • Know how to comply with relevant legislation and official guidance when excavating and providing temporary support to pits and trenches
    • Maintain safe and healthy working practices when excavating and providing temporary support to pits and trenches
    • Select the required quantity and quality of resources for the methods of work to excavate and provide temporary support to pits and trenches, Minimise the risk of damage to the work and surrounding area when excavating and providing temporary support to pits and trenches
    • Complete the work within the allocated time when excavating and providing temporary support to pits and trenches
    • Comply with the given contract information to excavate and provide temporary support to pits and trenches to the required specification
    6

    Excavating for underpinning in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when excavating for underpinning
    • Know how to comply with relevant legislation and official guidance when excavating for underpinning
    • Maintain safe and healthy working practices when excavating for underpinning
    • Select the required quantity and quality of resources for the methods of work to excavate for underpinning, Minimise the risk of damage to the work and surrounding area when excavating for underpinning
    • Complete the work within the allocated time when excavating for underpinning
    • Comply with the given contract information to excavate for underpinning to the required specification
    7

    Inspecting and completing user maintenance on plant or machinery in the workplace

    Verified
    Key Learning Objectives:
    • Identify relevant information relating to the work and resources when inspecting and completing user maintenance on plant or machinery.
    • Know how to comply with relevant legislation and official guidance when inspecting and completing user maintenance on plant or machinery.
    • Maintain safe and healthy working practices when inspecting and completing user maintenance on plant or machinery.
    • Select the required quantity and quality of resources for the methods of work to inspect and complete user maintenance on plant or machinery.Minimise the risk of damage to the work and surrounding area when inspecting and completing user maintenance on plant or machinery.
    • Complete the work within the allocated time when inspecting and completing user maintenance on plant or machinery.
    • Comply with the given contract information to inspect and complete user maintenance on plant or machinery to the required specification.
    8

    Installing deep well dewatering systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing deep well dewatering systems
    • Know how to comply with relevant legislation and official guidance when installing deep well dewatering systems
    • Maintain safe and healthy working practices when installing deep well dewatering systems
    • Select the required quantity and quality of resources for the methods of work to install deep well dewatering systems, Minimise the risk of damage to the work and surrounding area when installing deep well dewatering systems
    • Complete the work within the allocated time when installing deep well dewatering systems
    • Comply with the given contract information to install deep well dewatering systems to the required specification
    9

    Installing dry packing in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing dry packing
    • Know how to comply with relevant legislation and official guidance when installing dry packing
    • Maintain safe working practices when installing dry packing
    • Select the required quantity and quality of resources for the methods of work to install dry packing, Minimise the risk of damage to the work and surrounding area when installing dry packing
    • Complete the work within the allocated time when installing dry packing
    • Comply with the given contract information to install dry packing to the required specification
    10

    Installing ejector dewatering systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing ejector dewatering systems
    • Know how to comply with relevant legislation and official guidance when installing ejector dewatering systems
    • Maintain safe and healthy working practices when installing ejector dewatering systems
    • Select the required quantity and quality of resources for the methods of work to install ejector dewatering systems, Minimise the risk of damage to the work and surrounding area when installing ejector dewatering systems
    • Complete the work within the allocated time when installing ejector dewatering systems
    • Comply with the given contract information to install ejector dewatering systems to the required specification
    11

    Installing mass gravity retaining structures in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing mass gravity retaining structures
    • Know how to comply with relevant legislation and official guidance when installing mass gravity retaining structures
    • Maintain safe and healthy working practices when installing mass gravity retaining structures
    • Select the required quantity and quality of resources for the methods of work to install mass gravity retaining structures, Minimise the risk of damage to the work and surrounding area when installing mass gravity retaining structures
    • Complete the work within the allocated time when installing mass gravity retaining structures
    • Comply with the given contract information to install mass gravity retaining structures to the required specification
    12

    Installing mechanical ground anchors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing mechanical ground anchors
    • Know how to comply with relevant legislation and official guidance when installing mechanical ground anchors
    • Maintain safe and healthy working practices when installing mechanical ground anchors
    • Select the required quantity and quality of resources for the methods of work to install mechanical ground anchors, Minimise the risk of damage to the work and surrounding area when installing mechanical ground anchors
    • Complete the work within the allocated time when installing mechanical ground anchors
    • Comply with the given contract information to install mechanical ground anchors to the required specification
    13

    Installing open hole ground anchors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing open hole ground anchors
    • Know how to comply with relevant legislation and official guidance when installing open hole ground anchors
    • Maintain safe and healthy working practices when installing open hole ground anchors
    • Select the required quantity and quality of resources for the methods of work to install open hole ground anchors, Minimise the risk of damage to the work and surrounding area when installing open hole ground anchors
    • Complete the work within the allocated time when installing open hole ground anchors
    • Comply with the given contract information to install open hole ground anchors to the required specification
    14

    Installing piles in areas of restricted access (mini or micro piling) in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing piles in areas of restricted access (micro or mini piling)
    • Know how to comply with relevant legislation and official guidance when installing piles in areas of restricted access (micro or mini piling)
    • Maintain safe and healthy working practices when installing piles in areas of restricted access (micro or mini piling)
    • Select the required quantity and quality of resources for the methods of work to installing piles in areas of restricted access (mini or micro piling), Minimise the risk of damage to the work and surrounding area when installing piles in areas of restricted access (mini or micro piling)
    • Complete the work within the allocated time when installing piles in areas of restricted access (mini or micro piling)
    • Comply with the given contract information to install piles in areas of restricted access (mini or micro piling) to the required specification
    15

    Installing post tensioning system as sub-structural repair in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing post tensioning system as sub-structural repair
    • Know how to comply with relevant legislation and official guidance when installing post tensioning system as sub-structural repair
    • Maintain safe and healthy working practices when installing post tensioning system as sub-structural repair
    • Select the required quantity and quality of resources for the methods of work to install post tensioning system as sub-structural repair, Minimise the risk of damage to the work and surrounding area when installing post tensioning system as sub-structural repair
    • Complete the work within the allocated time when installing post tensioning system as sub-structural repair
    • Comply with the given contract information to install post tensioning system as sub-structural repair to the required specification
    16

    Installing precast concrete retaining structures in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing precast concrete retaining structures
    • Know how to comply with relevant legislation and official guidance when installing precast concrete retaining structures
    • Maintain safe and healthy working practices when installing precast concrete retaining structures
    • Select the required quantity and quality of resources for the methods of work to install precast concrete retaining structures, Minimise the risk of damage to the work and surrounding area when installing precast concrete retaining structures
    • Complete the work within the allocated time when installing precast concrete retaining structures
    • Comply with the given contract information to install precast concrete retaining structures to the required specification
    17

    Installing reinforcement for the formation of soil structures and slopes in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing reinforcement for the formation of soil structures and slopes
    • Know how to comply with relevant legislation and official guidance when installing reinforcement for the formation of soil structures and slopes
    • Maintain safe and healthy working practices when installing reinforcement for the formation of soil structures and slopes
    • Select the required quantity and quality of resources for the methods of work to install reinforcement for the formation of soil structures and slopes, Minimise the risk of damage to the work and surrounding area when installing reinforcement for the formation of soil structures and slopes
    • Complete the work within the allocated time when installing reinforcement for the formation of soil structures and slopes
    • Comply with the given contract information to install reinforcement for the formation of soil structures and slopes to the required specification
    18

    Installing reinforcement steel for underpinning in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing reinforcement steel for underpinning
    • Know how to comply with relevant legislation and official guidance when installing reinforcement steel for underpinning
    • Maintain safe and healthy working practices when installing reinforcement steel for underpinning
    • Select the required quantity and quality of resources for the methods of work to install reinforcement steel for underpinning, Minimise the risk of damage to the work and surrounding area when installing reinforcement steel for underpinning
    • Complete the work within the allocated time when installing reinforcement steel for underpinning
    • Comply with the given contract information to install reinforcement steel for underpinning to the required specification
    19

    Installing self-drilling ground anchors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing self-drilling ground anchors
    • Know how to comply with relevant legislation and official guidance when installing self-drilling ground anchors
    • Maintain safe and healthy working practices when installing self-drilling ground anchors
    • Select the required quantity and quality of resources for the methods of work to install self-drilling ground anchors, Minimise the risk of damage to the work and surrounding area when installing self-drilling ground anchors
    • Complete the work within the allocated time when installing self-drilling ground anchors
    • Comply with the given contract information to install self-drilling ground anchors to the required specification
    20

    Installing wellpoint dewatering systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing wellpoint dewatering systems
    • Know how to comply with relevant legislation and official guidance when installing wellpoint dewatering systems
    • Maintain safe and healthy working practices when installing wellpoint dewatering systems
    • Select the required quantity and quality of resources for the methods of work to install wellpoint dewatering systems, Minimise the risk of damage to the work and surrounding area when installing wellpoint dewatering systems
    • Complete the work within the allocated time when installing wellpoint dewatering systems
    • Comply with the given contract information to install wellpoint dewatering systems to the required specification
    21

    Installing, constructing, maintaining, dismantling and removing temporary works in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, constructing, maintaining, dismantling and removing temporary works
    22

    Installing, maintaining and removing work area protection and safety equipment in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when installing, maintaining and removing work area protection and safety equipment
    • Know how to comply with relevant legislation and official guidance when establishing work area protection and safety
    • Maintain safe and healthy working practices when installing, maintaining and removing work area protection and safety equipment
    • Select the required quantity and quality of resources for the methods of work to install
    • maintain and remove work area protection and safety equipment, Minimise the risk of damage to the work and surrounding area when installing, maintaining and removing work area protection and safety equipment
    • Complete the work within the allocated time when installing, maintaining and removing work area protection and safety equipment
    • Comply with the given contract information to install
    • maintain and remove work area protection and safety equipment to the required specification
    23

    Moving, handling and storing resources in the workplace

    Verified
    Key Learning Objectives:
    • Comply with given information when moving, handling and/or storing resources.
    • Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources.
    • Maintain safe working practices when moving, handling and/or storing resources.
    • Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources.Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources.
    • Complete the work within the allocated time when moving, handling and/or storing resources.
    • Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.
    24

    Placing and Compacting Concrete in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when placing and compacting concrete
    • Know how to comply with relevant legislation and official guidance when placing and compacting concrete
    • Maintain safe and healthy working practices when placing and compacting concrete
    • Select the required quantity and quality of resources for the methods of work to place and compact concrete, Minimise the risk of damage to the work and surrounding area when placing and compacting concrete
    • Complete the work within the allocated time when placing and compacting concrete
    • Comply with the given contract information to place and compact concrete to the required specification
    25

    Preparing the site for chemical and resin grouting and soil injection in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing the site for chemical and resin grouting and soil injection
    • Know how to comply with relevant legislation and official guidance when preparing the site for chemical and resin grouting and soil injection
    • Maintain safe and healthy working practices when preparing the site for chemical and resin grouting and soil injection
    • Select the required quantity and quality of resources for the methods of work to prepare the site for chemical and resin grouting and soil injection, Minimise the risk of damage to the work and surrounding area when preparing the site for chemical and resin grouting and soil injection
    • Complete the work within the allocated time when preparing the site for chemical and resin grouting and soil injection
    • Comply with the given contract information to prepare the site for chemical and resin grouting and soil injection to the required specification
    26

    Preparing the site for the installation of dewatering systems in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing the site for the installation of dewatering systems
    • Know how to comply with relevant legislation and official guidance when preparing the site for the installation of dewatering systems
    • Maintain safe and healthy working practices when preparing the site for the installation of dewatering systems
    • Select the required quantity and quality of resources for the methods of work to prepare the site for the installation of dewatering systems, Minimise the risk of damage to the work and surrounding area when preparing the site for the installation of dewatering systems
    • Complete the work within the allocated time when preparing the site for the installation of dewatering systems
    • Comply with the given contract information to prepare the site for the installation of dewatering systems to the required specification
    27

    Preparing the site for the installation of post tensioning systems as sub-structural repair in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing the site for the installation of post tensioning systems as sub-structural repair
    • Know how to comply with relevant legislation and official guidance when preparing the site for the installation of post tensioning systems as sub-structural repair
    • Maintain safe and healthy working practices when preparing the site for the installation of post tensioning systems as sub-structural repair
    • Select the required quantity and quality of resources for the methods of work to prepare the site for the installation of post tensioning systems as sub-structural repair, Minimise the risk of damage to the work and surrounding area when preparing the site for the installation of post tensioning systems as sub-structural repair
    • Complete the work within the allocated time when preparing the site for the installation of post tensioning systems as sub-structural repair
    • Comply with the given contract information to prepare the site for the installation of post tensioning systems as sub-structural repair to the required specification
    28

    Preparing the site to install ground anchors in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing the site to install ground anchors
    • Know how to comply with relevant legislation and official guidance when preparing the site to install ground anchors
    • Maintain safe and healthy working practices when preparing the site to install ground anchors
    • Select the required quantity and quality of resources for the methods of work to prepare the site to install ground anchors, Minimise the risk of damage to the work and surrounding area when preparing the site to install ground anchors
    • Complete the work within the allocated time when preparing the site to install ground anchors
    • Comply with the given contract information to prepare the site to install ground anchors to the required specification
    29

    Preparing to install gas membranes in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when preparing to install gas membranes
    • Know how to comply with relevant legislation and official guidance when preparing to install gas membranes
    • Maintain safe and healthy working practices when preparing to install gas membranes
    • Select the required quantity and quality of resources for the methods of work to prepare to install gas membranes, Minimise the risk of damage to the work and surrounding area when preparing to install gas membranes
    • Complete the work within the allocated time when preparing to install gas membranes
    • Comply with the given contract information to prepare to install gas membranes to the required specification
    30

    Repairing sub-structure after underpinning in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when repairing sub-structure after underpinning
    • Know how to comply with relevant legislation and official guidance when repairing sub-structure after underpinning
    • Maintain safe and healthy working practices when repairing sub-structure after underpinning
    • Select the required quantity and quality of resources for the methods of work to repair sub-structure after underpinning, Minimise the risk of damage to the work and surrounding area when repairing sub-structure after underpinning
    • Complete the work within the allocated time when repairing sub-structure after underpinning
    • Comply with the given contract information to repair sub-structure after underpinning to the required specification
    31

    Setting out and marking positions for underpinning sequence in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when setting out and marking positions for underpinning sequence
    • Know how to comply with relevant legislation and official guidance when setting out and marking positions for underpinning sequence
    • Maintain safe and healthy working practices when setting out and marking positions for underpinning sequence
    • Select the required quantity and quality of resources for the methods of work to set out and mark positions for underpinning sequence, Minimise the risk of damage to the work and surrounding area when setting out and marking positions for underpinning sequence
    • Complete the work within the allocated time when setting out and marking positions for underpinning sequence
    • Comply with the given contract information to set out and mark positions for underpinning sequence to the required specification
    32

    Setting Out Secondary Dimensional Work Control in the Workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to setting out dimensional control of the work.
    • Know how to comply with relevant legislation and official guidance to set out dimensional control of the work.
    • Maintain safe and healthy working practices when setting out dimensional control of the work.
    • Select the required quantity and quality of resources to set out dimensional control of the work. Minimise the risk of damage to the work and surrounding area when setting out dimensional control of the work.
    • Complete the work within the allocated time when setting out dimensional control of the work.
    • Comply with the given contract information to set out dimensional control of the work to the required specification.
    33

    Stabilising steep slopes in the workplace

    Verified
    Key Learning Objectives:
    • Interpret the given information relating to the work and resources when stabilising steep slopes
    • Know how to comply with relevant legislation and official guidance when stabilising steep slopes
    • Maintain safe and healthy working practices when stabilising steep slopes
    • Select the required quantity and quality of resources for the methods of work to stabilise steep slopes, Minimise the risk of damage to the work and surrounding area when stabilising steep slopes
    • Complete the work within the allocated time when stabilising steep slopes
    • Comply with the given contract information to stabilise steep slopes to the required specification

    Regulatory & Verification Details

    Qualification Number (QN)
    603/1144/7
    Regulated Status
    Available to learners
    Awarding Body
    ProQual
    Qualification Type
    Occupational Qualification
    Operational Start
    Mar 2017