Learning outcomes
- be able to plan and prepare work activities for decommissioning, installing, exchanging and commissioning smart gas meters and regulators (up to 6.0m3/h) on medium pressure fed natural gas systems.
- be able to de-commission smart gas meters and regulators (up to 6.0m3/h) on medium pressure fed natural gas systems.
- be able to install and exchange smart gas meters and regulators (up to 6.0m3/h) on medium pressure fed natural gas systems.
Show all 6 objectives
- be able to commission smart gas meters and regulators (up to 6.0m3/h) on medium pressure fed natural gas systems.
- be able to liaise with other persons and re
- solve problems relating to decommissioning, installing, exchanging and commissioning smart gas meters and regulators (up to 6.0m3/h) on medium pressure fed natural gas systems.