Skip to topic
    ← Back to course topics

    Install overhead line equipment small part steelwork — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines.2.
    2. Carry out all of the following activities during the installation:2.
    3. adhere to safety briefing instructions, risk assessments, COSHH, safe system of work and other relevant safety standards;2.
    Show all 20 objectives
    1. checks to ensure currency of installation documentation (such as drawings, layouts, instructions, manufacturers' data, settings and other documentation);2.
    2. obtain authority before carrying out the installation activities;2.
    3. dispose of waste items in accordance with the project plan;2.
    4. leave the work area in a safe condition.3.
    5. Select and use correctly six of the following types of personal protection equipment:3.
    6. safety harnesses;3.
    7. safely helmets;3.
    8. approved high visibility clothing;3.
    9. approved safety footwear;3.
    10. ear protection (as appropriate);3.
    11. other specific equipment;4.
    12. Use the correct tools, plant and equipment for the installation and check that they are in a safe and usable condition and are fit for purpose5.
    13. Interpret the small part steel component requirements from all of the following design drawings and specifications:5.
    14. cross sections;5.
    15. OLE system design range (such as OLEMI) (as appropriate);6.
    16. Follow all relevant drawings and specifications for the installation being carried out.7.
    17. Undertake all of the following installation activities:7.

    Install overhead line equipment small part steelwork assessment help

    Unit assessment details

    Loading assessment details…