Learning outcomes
- Work safely at all times following health and safety legislation, regulations and safeworking practices and procedures, from the following as applicable to the work locationand activities:1.1 organisation's safety management system1.2 relevant sections of the HASWA1.3 COSHH1.4 safe work plans1.5 track access restrictions1.6 track work instructions1.7 track possession1.8 task risk control sheets1.9 current rule book1.10 regulations for working under OHLE and in the vicinity of DC lines (where appropriate)1.11 equipment disconnections1.12 manual handling regulations1.13 RIDDOR1.14 safety sign regulations1.15 PPE
- In line with organisational procedures withdraw all possession and protection measures
- Take the appropriate action to confirm that the work area is secured on completion of the
Show all 11 objectives
- Identify the access requirements related to two of the following types of sitelocations:3.1 trackside3.2 internal (such as signal box, equipment room)3.3 areas to which the public have access3.4 confined spaces3.5 elevated structures
- Restore the work areas to a safe condition in accordance with agreed requirements andschedules and assist in the completion of the relevant records, to include one of thefollowing, and pass it to the appropriate people:4.1 job card4.2 maintenance log and action report4.3 company reporting procedures4.4 other handover records ref: ( )
- Take action to separate equipment, components and materials for re-use from wasteitems
- Take action to store reusable materials and equipment in an appropriate location includingthe following as applicable to the work activities:6.1 tools6.2 test equipment6.3 materials6.4 consumables6.5 plant6.6 communications equipment
- Identify, mark and secure any waste items that cannot be removed immediatelymaintaining the safe operation of the railway at all times
- Identify all plant, tools and test equipment that cannot be removed and ensure that it issecured and stored where they do not interfere with the safe operation of the railway
- Dispose of waste materials in line with organisational procedures
- Deal promptly and effectively with problems within own control and report those thatcannot be resolved