Skip to topic
    ← Back to course topics

    Schedule rail engineering activities — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Confirm the activities and resources that are required to achieve the engineeringmethods and procedures
    2. Demonstrate the required behaviours in line with the job role and companyobjectives
    3. Carry out all of the following when scheduling operational activities:1.1 refer to any existing schedules that may be appropriate1.2 determine the engineering activities to be scheduled1.3 identify applicable engineering methods, processes and procedures(including any specific sequencing requirements)1.4 identify and schedule time and resources1.5 review the schedule, and develop contingency plans to eliminate anydifficulties1.6 ensure that the schedule complies with all relevant regulations, standardsand guidelines1.7 communicate the schedule to all relevant people
    Show all 16 objectives
    1. Schedule engineering activities for one of the following:2.1 manufacturing (such as machining, fabrication, welding, material finishingor manufacture, assembly, joining)2.2 design2.3 research2.4 product or system installation2.5 commissioning2.6 decommissioning or recycling2.7 environmental or sustainability2.8 operational processes (such as movement of materials and logistics)2.9 maintenance practices (such as preventative, corrective, predictive,reactive or prevention)2.10 processing operations2.11 service supplies (such as gas, water, electricity)2.12 engineering support functions (such as procurement, quality assurance,inspection, testing, scheduled safety audits and risk assessments,business improvement)S3 Establish requirements for one of the following:3.1 equipment/component/system capacity or capability3.2 equipment/component/system performance3.3 equipment/component/system life cyclePage 3 of 5REATC4-003 Issue 1.03.4 maintenance and repair3.5 people performance3.6 people capacity or capability3.7 product or process quality3.8 supplier capacity or capability3.9 business support function capacity or capability
    2. Obtain data for engineering activities from three of the following:4.1 management4.2 design office4.3 industrial engineering4.4 client4.5 plant engineering4.6 process engineering4.7 quality engineering4.8 suppliers4.9 purchasing4.10 safety engineering4.11 technical data, charts, reference tables or manuals4.12 production engineering4.13 company information system4.14 human resources (HR) personnel4.15 external technical consultants/experts
    3. Identify the most suitable sequence of activities
    4. Schedule the time and resources available for undertaking the activities
    5. Prepare and review schedules of resources, including four of the following:5.1 personnel5.2 equipment5.3 materials5.4 skills required5.5 facilities5.6 finance5.7 time
    6. Ensure that schedules are capable of meeting all relevant requirements
    7. Incorporate new schedules into the engineering process with minimal disruption
    8. Identify potential difficulties and produce appropriate contingency plans
    9. Confirm that schedules meet requirements, or produce a contingency plan,including one of the following:6.1 agree revised requirements with management/client6.2 obtain additional/alternative resources6.3 change timescales in agreement with management/clients6.4 recommend a change to the process Page 4 of 5REATC4-003 Issue 1.06.5 reschedule6.6 other specific change
    10. Ensure that schedules comply with all relevant regulations, directives andguidelines
    11. Ensure that schedules comply with three of the following:7.1 organisational guidelines and procedures7.2 recognised compliance agency/body's standards, directives or codes ofpractice7.3 equipment manufacturer's operating specification/range7.4 health, safety and environmental requirements7.5 customer standards and requirements7.6 British, European or International standards or directives
    12. Specify clearly the schedules and record them in the appropriate informationsystems
    13. Report and communicate schedules to the appropriate people, using:8.1 verbal reportPlus one from the following:8.2 electronic mail8.3 computer-based presentation8.4 computer generated rep

    Schedule rail engineering activities assessment help

    Unit assessment details

    Loading assessment details…