AQA · A-Level · Accounting
Course version: 7127 · Version from Sept 2017
Absorption and activity based costing: allocation of direct costs
Allocation of direct costs means charging a cost to the specific cost unit, department or product that caused it, because the cost can be traced directly with no apportionment.
- Point 3 of 9
Study notes
From the teaching notes for this specification point.
The idea
Allocation of direct costs means charging a cost to the specific cost unit, department or product that caused it, because the cost can be traced directly with no apportionment. A direct material used solely on one job, or the wages of staff working only on that job, are allocated in full to it. Contrast this with indirect costs, which cannot be traced to one unit and must be apportioned, absorbed or driven by activities. Check that the whole cost, not a share, is charged to the unit that caused it.
What earns the marks
- Charges the whole of a traceable cost to the specific cost unit that caused it.
- Identifies direct materials and direct labour as costs that can be allocated rather than apportioned.
- Distinguishes allocation from apportionment, absorption and activity based costing.
- Selects the option in which a cost is charged in full to the unit it is traceable to.
Common mistakes and how to put them right
Apportions a cost that is traceable to one unit.
Put it right: Allocate the whole cost to that unit.
Treats allocation as spreading overheads across departments.
Put it right: Reserve allocation for costs that can be traced directly.
Charges only a proportion of a direct cost to the unit.
Put it right: Charge the full traceable amount.
Exam tips
- Ask whether the cost can be traced to the named unit; if yes, allocation applies.
- Eliminate options that describe sharing or absorbing overheads, since those are not allocation.
- Re-read the stem to confirm which unit caused the cost before choosing.
Try the lesson
The start of the Absorption and activity based costing: allocation of direct costs lesson, made from teaching notes for this specification point.
Have a go first
A furniture maker uses 40 kg of timber on a specific job. The timber cost £6 per kg. What is the direct material cost allocated to that job?
There is more to this lesson
The full lesson goes on to check your understanding and help you earn the marks. Create a free account to carry on, with your progress saved.
A week of Premium from your first lesson · Then the free plan continues · No card, no charge
Test your understanding of Absorption and activity based costing: allocation of direct costs
Active recall beats re-reading. Take an instant quiz now to test what you’ve learned and lock it into long-term memory.
A week of Premium from your first lesson · Then the free plan continues · No card, no charge