Absorption and activity based costing: overhead absorption rates.
An overhead absorption rate (OAR) recovers production overhead into the cost of units.
- Point 5 of 9
Study notes
From the teaching notes for this specification point.
The idea
An overhead absorption rate (OAR) recovers production overhead into the cost of units. Calculate it as budgeted overhead divided by budgeted activity, where activity may be labour hours, machine hours or units. For example, budgeted overhead of £90,000 and 15,000 budgeted labour hours give an OAR of £6 per labour hour. To absorb overhead into a job, multiply the OAR by the actual activity the job uses: a job taking 200 labour hours absorbs £1,200. Compare overhead absorbed with overhead actually incurred to find under- or over-absorption. If actual overhead exceeds absorbed overhead the result is under-absorption; if absorbed exceeds actual, it is over-absorption. Absorption differs from activity based costing, which assigns overhead using multiple cost drivers rather than one volume-based rate.
What earns the marks
- Defines the overhead absorption rate as budgeted overhead divided by budgeted activity.
- Selects an activity base such as labour hours, machine hours or units and states the rate per unit of that base.
- Calculates the OAR correctly, for example £90,000 ÷ 15,000 hours = £6 per labour hour.
- Absorbs overhead into a job by multiplying the OAR by the actual activity used by that job.
- Compares overhead absorbed with overhead incurred to identify under-absorption or over-absorption.
- Distinguishes absorption costing from activity based costing, which uses multiple cost drivers.
Common mistakes and how to put them right
Divides actual overhead by actual hours.
Put it right: Use budgeted overhead over budgeted activity to set the predetermined rate.
Multiplies the OAR by budgeted rather than actual activity for a specific job.
Put it right: Apply the rate to the activity the job actually uses.
Reverses the under- and over-absorption labels.
Put it right: Compare absorbed with incurred and name the difference accordingly.
Treats absorption costing and activity based costing as identical.
Put it right: Note that ABC uses several cost drivers.
Exam tips
- Write the OAR formula before substituting figures so the method is clear.
- Label the activity base in the rate, for example £6 per labour hour, not just £6.
- Show absorbed overhead and incurred overhead on separate lines before stating the variance.
- Check whether the question wants the rate, the absorbed amount or the under-/over-absorption.
Try the lesson
The start of the Absorption and activity based costing: overhead absorption rates. lesson, made from teaching notes for this specification point.
Have a go first
A factory has budgeted overheads of £120,000 and budgeted direct labour hours of 8,000. What is the overhead absorption rate per direct labour hour?
There is more to this lesson
The full lesson goes on to check your understanding and help you earn the marks. Create a free account to carry on, with your progress saved.
A week of Premium from your first lesson · Then the free plan continues · No card, no charge
Test your understanding of Absorption and activity based costing: overhead absorption rates.
Active recall beats re-reading. Take an instant quiz now to test what you’ve learned and lock it into long-term memory.
A week of Premium from your first lesson · Then the free plan continues · No card, no charge