Skip to topic
    ← Back to course topics

    Carry out maintenance on railway conductor rail electrification equipment and components — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Set up a safe system of work for the activity and work to the system
    2. Follow the relevant maintenance schedules and instructions
    3. Carry out the maintenance activities within limits of own authority
    Show all 6 objectives
    1. Identify instances where the maintenance activities cannot be fully met or where there are identified defects outside the plannedTake the relevant action where defects arise
    2. Report instances where the maintenance activities cannot be fully met or where there are identified defects outside the planned schedule
    3. Complete relevant maintenance records and pass to the appropriate person(s)Dispose of waste materials in line with the organisation’s procedures

    Carry out maintenance on railway conductor rail electrification equipment and components assessment help

    Unit assessment details

    Loading assessment details…