Skip to topic
    ← Back to course topics

    Conduct maintenance testing of signalling assets — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Work safely at all times following the health and safety legislation, regulations and safe working practices and procedures, from the following as applicable to the work location and activities: 1.1 organisation's safety management system1.2 relevant sections of the HASWA 1.3 COSHH 1.4 safe work plans 1.5 track access restrictions 1.6 authorised test plan 1.7 track work instructions 1.8 track possession 1.9 task risk control sheets 1.10 current rule book 1.11 regulations for working under OHLE and in the vicinity of DC lines (where appropriate) 1.12 equipment disconnections 1.13 manual handling regulations 1.14 RIDDOR 1.15 safety sign regulations 1.16 PPE 2.
    2. Determine the scope of the work to be carried out and the status of previously tested equipment 3. Confirm that all the required documentation is available and accurately identifies the work to be undertaken 4.
    3. Identify and analyse any necessary changes to safety requirements on arriving at site, including prompt reporting to the relevant person(s) the access requirements related to two of the following types of site testing locations 4.
    Show all 20 objectives
    1. trackside 4.
    2. internal (such as signal box, equipment room) 4.
    3. areas to which the public have access 4.
    4. confined spaces 4.
    5. elevated structures 5.
    6. Identify and interpret the appropriate procedures and instructions for use of tools and test equipment when carrying out the required tests to ensure that accurate measurements are taken.
    7. Use the following types of tools and equipment as applicable to the equipment being tested:5.
    8. calibrated hand tools5.
    9. un-calibrated hand tools5.
    10. calibrated test leads/loads5.
    11. computerised test equipment5.
    12. test recording equipment5.
    13. other specific signalling test equipment6. Confirm that the tests and checks are appropriate to the equipment and are in line with testing procedures and instructions. Conduct testing of one of the following types of repaired signalling equipment:6.
    14. train control (such as signals or other method of authorising train movements)6.
    15. train detection (such as track circuits or axle counters)6.
    16. power supplies6.
    17. other industry specific signal equipment: ref: ( )7. Using approved procedures, the test plan and within the agreed timescales, set up and carry out the tests and checks in sufficient detail to establish the equipment status as applicable to the type of signalling equipment being tested:7.1 inspection7.2 wire count7.3 security7.4 profile7.5 labelling7.6 correlation7.7 conformity to diagrams7.8 system configuration7.9 physical condition7.10 other industry specific signalling checks8.

    Conduct maintenance testing of signalling assets assessment help

    Unit assessment details

    Loading assessment details…