    Install, enhance and renew overhead line earthing and bonding — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines.2.
    2. Carry out all of the following activities during the installation:2.
    3. adhere to safety briefing instructions, risk assessments, COSHH, safe system of work and other relevant safety standards2.
    Show all 20 objectives
    1. checks to ensure currency of documentation (such as drawings, layouts, instructions, manufacturers' data, settings and other documentation)2.
    2. obtain authority before carrying out the earthing and bonding activities2.
    3. dispose of waste items in accordance with the project plan2.
    4. leave the work area in a safe condition3.
    5. Select and use correctly six of the following types of personal protection equipment:3.
    6. safety harnesses3.
    7. safely helmets3.
    8. approved high visibility clothing3.
    9. approved safety footwear3.
    10. ear protection (as appropriate)3.
    11. other specific equipment4.
    12. Use the correct tools, plant and equipment for the installation and check that they are in a safe and usable condition and are fit for purpose5.
    13. Interpret earthing and bonding requirements from all of the following design drawings and specifications:5.
    14. cross sections5.
    15. bonding layouts6.
    16. Follow all relevant drawings and specifications for the installation being carried out7.
    17. Carry out earthing and bonding activities including all of the following:7.

    Install, enhance and renew overhead line earthing and bonding assessment help