Install, enhance and renew overhead line earthing and bonding — EAL Vocational Motor Vehicle & Transport
Learning outcomes
- Work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines.2.
- Carry out all of the following activities during the installation:2.
- adhere to safety briefing instructions, risk assessments, COSHH, safe system of work and other relevant safety standards2.
Show all 20 objectives
- checks to ensure currency of documentation (such as drawings, layouts, instructions, manufacturers' data, settings and other documentation)2.
- obtain authority before carrying out the earthing and bonding activities2.
- dispose of waste items in accordance with the project plan2.
- leave the work area in a safe condition3.
- Select and use correctly six of the following types of personal protection equipment:3.
- safety harnesses3.
- safely helmets3.
- approved high visibility clothing3.
- approved safety footwear3.
- ear protection (as appropriate)3.
- other specific equipment4.
- Use the correct tools, plant and equipment for the installation and check that they are in a safe and usable condition and are fit for purpose5.
- Interpret earthing and bonding requirements from all of the following design drawings and specifications:5.
- cross sections5.
- bonding layouts6.
- Follow all relevant drawings and specifications for the installation being carried out7.
- Carry out earthing and bonding activities including all of the following:7.
Install, enhance and renew overhead line earthing and bonding assessment help