Carry out replacement of components from telecoms assets — EAL Vocational Motor Vehicle & Transport
Learning outcomes
- Work safely at all times, complying with your organisation's procedures, following the health and safety legislation, regulations and safe working practices and procedures, from the following as applicable to the work location and activities:1.1 organisation's safety management system1.2 relevant sections of the HASWA1.3 COSHH1.4 safe work plans1.5 track access restrictions1.6 track work instructions1.7 track possession1.8 task risk control sheets1.9 current rule book1.10 regulations for working under OHLE and in the vicinity of DC lines (where appropriate)1.11 equipment disconnections1.12 manual handling regulations1.13 RIDDOR1.14 safety sign regulations1.15 PPE2.
- Identify and analyse any necessary changes to safety requirements on arriving at site, including prompt reporting to the relevant person(s) related to access to two of the following types of site locations:2.
- internal (such as telecoms box, equipment room)2.
Show all 18 objectives
- areas to which the public have access2.
- confined spaces2.
- elevated structures3. Source and interpret all relevant diagrams and specifications4. Obtain all the required component(s) and ensure that they are in a suitable condition for replacement and fit for purpose5. Check the replacement component(s) to ensure compliance with the required specification including confirming that the replacement component is compatible with the equipment/system6. Take adequate precautions to prevent damage to component(s) during replacement, including electrostatic protection if applicable7.
- Carry out the replacement of component(s) in the correct sequence using appropriate tools and techniques.
- Complete two types of telecoms equipment from group A and tools and equipment as applicable from group B:Group A: replace components from two of the following types of telecoms equipment:7.1 transmission systems7.2 bearer circuits7.3 telecoms bearers carrying signalling circuits7.4 SCADA7.5 operational telephones7.6 switches and systems (such as telephone exchanges & concentrators)7.7 railway operational information systems7.8 PA and CCTV7.9 operational CCTV (such as OPO/DOO)7.10 GSM-R7.11 other industry specific telecoms equipment: ref: ( )Group B
- use approved/calibrated tools and equipment as applicable to the components being replaced:7.12 power tools7.13 hand tools7.14 wire and cable strippers/cutters7.15 IDC tools7.16 termination tools7.17 wrenches7.18 soldering irons7.19 manual handling equipment8.
- Ensure that authorised practices are used where existing instructions are insufficient9.
- Ensure that the replacement is complete and that all components are free from damage including checking that all necessary connections to the equipment are complete. Connect the following connections as applicable to the equipment:9.
- mechanical9.
- other specific type of termination/connection: ref: ( )10.
- Ensure that interference with other systems is minimised, and equipment and systems other than those being maintained are not disturbed without authority.11. Make any necessary settings or adjustments to the component(s) to ensure they will function correctly12.
- Complete the replacement integrity checks in accordance with appropriate standards and that the completed work is to specification
- work must comply with one of the following:12.1 infrastructure guidelines and standard operating procedures12.2 equipment manufacturer's documents12.3 BS, ISO and/or BS EN standards12.4 TMTH12.5 other industry specific telecoms standards/specifications: ref: ( )13. Observe sufficient operations of the asset to confirm it is functioning correctly14. Deal promptly and effectively with problems within your control and report those that cannot be resolved15.
- Complete all relevant documentation accurately and in accordance with your organisation's procedures
- complete one of the following:15.1 job card15.2 TMTH15.3 equipment logs and action report15.4 company reporting procedures15.5 oth
Carry out replacement of components from telecoms assets assessment help