Learning outcomes
- Work safely at all times following health and safety legislation, regulations and safe working practices and procedures, from the following as applicable to the work location and activities:1.1 organisation's safety management system1.2 relevant sections of the HASWA1.3 COSHH1.4 safe work plans1.5 track access restrictions1.6 track work instructions1.7 track possession1.8 task risk control sheets1.9 current rule book1.10 regulations for working under OHLE and in the vicinity of DC lines (where appropriate)1.11 equipment disconnections1.12 manual handling regulations1.13 RIDDOR1.14 safety sign regulations1.15 PPE2. In line with organisational procedures withdraw all possession and protection measures3. Take the appropriate action to confirm that the work area is secured on completion of the work
- Identify the access requirements related to two of the following types of site locations:3.
- internal (such as signal box, equipment room)3.
Show all 20 objectives
- areas to which the public have access3.
- confined spaces3.
- elevated structures4. estore the work areas to a safe condition in accordance with agreed requirements and schedules and assist in the completion of the relevant records, to include one of the following, and pass it to the appropriate people:4.
- maintenance log and action report4.
- company reporting procedures4.
- other handover records ref: ( )5. Take action to separate equipment, components and materials for re-use from waste items6. Take action to store reusable materials and equipment in an appropriate location including the following as applicable to the work activities:6.
- test equipment6.
- consumables6.
- communications equipment7.
- Identify, mark and secure any waste items that cannot be removed immediately maintaining the safe operation of the railway at all times8.
- Identify all plant, tools and test equipment that cannot be removed and ensure that it is secured and stored where they do not interfere with the safe operation of the railway9. Dispose of waste materials in line with organisational procedures10. Deal promptly and effectively with problems within own control and report those that cannot be resolved.1K. List the relevant health and safety legislation, regulations and safe working practices and procedures as appropriate to the activity2K.
- Describe the relevant railway possession and protection arrangements for the work site and equipment to provide a safe system of work and how to check these have been withdrawn3K.
- Explain the organisational procedures for restoring the work area4K.
- Describe the work area security requirements5K.
- Explain the organisational procedures for storing material and equipment6K.
- Explain the different types of materials and equipment to be stored7K.
- Describe the different types, methods and procedures for the disposal of waste and hazardous substances which have organisational approval8K.
Reinstate the work area after signal engineering activities assessment help