    Evaluate rail engineering risk assessments — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Evaluate risk assessment activities for one of the following:1.1 manufacturing (such as machining, fabrication, welding, material finishingor manufacture, assembly, joining)1.2 design1.3 research1.4 product or system installation1.5 commissioning1.6 decommissioning or recycling1.7 environmental or sustainability1.8 operational processes (such as movement of materials and logistics)1.9 maintenance practices (such as preventative, corrective, predictive,reactive or prevention)1.10 processing operations1.11 service supplies (such as gas, water, electricity)1.12 engineering support functions (such as procurement, quality assurance,inspection, testing, scheduled safety audits and risk assessments,business improvement)P1 Establish clear criteria for the evaluation activity
    2. Demonstrate the required behaviours in line with the job role and companyobjectives
    3. Plan the most appropriate method for evaluating the risk assessments
    Show all 11 objectives
    1. Confirm the completed risk assessments are current, valid and reliable
    2. Ensure that any relevant regulations, directives or guidelines relating to the riskshave been identified
    3. Evaluate and rank the potential impact of the risks identified
    4. Evaluate the potential risks by considering the impact on three of the following:2.1 personnel2.2 equipment2.3 property/assets2.4 quality2.5 environment2.6 impact on the business (such as finance, branding, market)2.7 other (to be specified)P7 Ensure that the evaluation outcomes of the risks are communicated to theappropriate peoplePage 3 of 4REATC4-023 Issue 1.0P8 Monitor and review the effectiveness of the risk assessment process
    5. Recommend appropriate actions that includes three of the following:3.1 a risk reduction process3.2 continuing (such as the risk ranking result is acceptable)3.3 allowing a period of time before re-analysis3.4 implementing a special monitoring processes3.5 suspending operation and rectifying immediately3.6 implementing interim containment action
    6. Make amendments to the process where improvements have been identified
    7. Record the evaluation of risk assessments in the appropriate information system
    8. Record the risk information and include references to six of the following:4.1 the company health and safety policy4.2 a description of the risk(s) and their ranking4.3 accident and or `near miss' reports4.4 the implication of a risk occurring4.5 identification of regulations and or guidelines4.6 general management organisation4.7 the method of assessing and ranking the risk4.8 frequency and duration of exposure4.9 predictable and preventable risks4.10 analysis, decisions and recommendations

    Evaluate rail engineering risk assessments assessment help