Skip to topic
    ← Back to course topics

    Implement rail engineering processes — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Confirm that conditions are suitable to implement engineering methods andprocedures
    2. Confirm conditions for four of the following:1.1 appropriate authorisation is obtained1.2 preparation of products or processes1.3 health and safety1.4 preparation of site1.5 environmental1.6 availability of resources
    3. Demonstrate the required behaviours in line with the job role and companyobjectives
    Show all 16 objectives
    1. Implement an engineering process for one of the following:2.1 manufacturing (such as machining, fabrication, welding, material finishingor manufacture, assembly, joining)2.2 design2.3 research2.4 product or system installation2.5 commissioning2.6 decommissioning or recycling2.7 environmental or sustainability2.8 operational processes (such as movement of materials and logistics)2.9 maintenance practices (such as preventative, corrective, predictive,reactive or prevention)2.10 processing operations2.11 service supplies (such as gas, water, electricity)2.12 engineering support functions (such as procurement, quality assurance,inspection, testing, scheduled safety audits and risk assessments,business improvement)P3 Provide clear and accurate instructions to all the relevant people
    2. Provide instructions for one of the following:3.1 equipment/component/system capacity or capability3.2 equipment/component/system performance3.3 maintenance and repair3.4 people performance3.5 people capacity or capability Page 3 of 5REATC4-004 Issue 1.03.6 product or process quality3.7 supplier capacity or capability3.8 business support function capacity or capability
    3. Obtain accurate information on the activities being undertaken
    4. Obtain information from two of the following:4.1 management4.2 design office4.3 industrial engineering4.4 client4.5 plant engineering4.6 process engineering4.7 quality engineering4.8 suppliers4.9 purchasing4.10 safety engineering4.11 technical data, charts, reference tables or manuals4.12 production engineering4.13 company information system4.14 human resources (HR) personnel4.15 external technical consultants/experts
    5. Ensure that quality assurance systems are correctly implemented
    6. Ensure that engineering support systems are operating correctly
    7. Control the use of resources to achieve the most effective results
    8. Ensure that all support and control systems operate effectively for two of thefollowing:5.1 quality assurance systems5.2 transport5.3 logistics5.4 procurement5.5 supervision or leadership structures5.6 utilities5.7 resource supply (such as materials, equipment, personnel)5.8 other technical support requirements
    9. Identify opportunities to improve the engineering methods and procedures
    10. Implement engineering processes that comply with three of the following:6.1 organisational guidelines and procedures6.2 recognised compliance agency/body's standards, directives or codes ofpractice6.3 equipment manufacturer's operating specification/range6.4 health, safety and environmental requirements6.5 customer standards and requirementsPage 4 of 5REATC4-004 Issue 1.06.6 British, European or International standards or directives
    11. Implement engineering processes that include four of the following:7.1 a record of the implementation process on appropriate company media7.2 an evaluation of the effectiveness of the implementation process7.3 any deviations from specifications of the implemented activity7.4 recommendations for improvements to the implemented activity7.5 plans to monitor and evaluate the effect(s) of any improvements made tothe implemented process
    12. Ensure that the implementation of engineering methods and procedures complieswith all relevant regulations, directives and guidelines
    13. Report and communicate methods and procedures for the engineering process,using:8.1 verbal reportPlus one from the following:8.2 electronic mail8.3 computer generated report8.4 specific company form8.5 other appropriate media

    Implement rail engineering processes assessment help

    Unit assessment details

    Loading assessment details…