Install overhead line equipment main steelwork — EAL Vocational Motor Vehicle & Transport
Learning outcomes
- Work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines.2.
- Carry out all of the following activities during the installation:2.
- adhere to safety briefing instructions, risk assessments, COSHH, safe system of work and other relevant safety standards;2.
Show all 20 objectives
- checks to ensure currency of installation documentation (such as drawings, layouts, instructions, manufacturers' data, settings and other documentation);2.
- obtain authority before carrying out the installation activities;2.
- dispose of waste items in accordance with the project plan;2.
- leave the work area in a safe condition3.
- Select and use correctly six of the following types of personal protection equipment:3.
- safety harnesses;3.
- safely helmets;3.
- approved high visibility clothing;3.
- approved safety footwear;3.
- ear protection (as appropriate);3.
- other specific equipment;4.
- Use the correct tools, plant and equipment for the installation and check that they are in a safe and usable condition and are fit for purpose.5.
- Interpret the main steel component requirements from all of the following design drawings and specifications:5.
- cross sections;5.
- OLE system design range (such as OLEMI) (as appropriate);6.
- Follow all relevant drawings and specifications for the installation being carried out.7.
- Undertake all of the following installation activities:7.
Install overhead line equipment main steelwork assessment help
Unit assessment details
Loading assessment details…