Skip to topic
    ← Back to course topics

    Monitor and evaluate rail engineering processes — EAL Vocational Motor Vehicle & Transport

    Learning outcomes

    1. Plan the most appropriate way for evaluating the engineering process
    2. Monitor and evaluate two engineering processes for one of the following:1.1 manufacturing (such as machining, fabrication, welding, material finishingor manufacture, assembly, joining)1.2 design1.3 research1.4 product or system installation1.5 commissioning1.6 decommissioning or recycling1.7 environmental or sustainability1.8 operational processes (such as movement of materials and logistics)1.9 maintenance practices (such as preventative, corrective, predictive,reactive or prevention)1.10 processing operations1.11 service supplies (such as gas, water, electricity)1.12 engineering support functions (such as procurement, quality assurance,inspection, testing, scheduled safety audits and risk assessments,business improvement)P2 Demonstrate the required behaviours in line with the job role and companyobjectives
    3. Establish clear and precise criteria for evaluating the engineering process
    Show all 14 objectives
    1. Establish criteria for monitoring and evaluation of one of the following:2.1 equipment capability2.2 equipment performance measurement2.3 the use of computer based records systems for engineering processes
    2. Evaluate the effectiveness of the engineering process, taking into account six of thefollowing:3.1 standard operating procedures/work instructions3.2 process/quality control or assurance documentation3.3 organisation documentation used (such as for purchasing, planningscheduling, contracting, sales and marketing)3.4 IT systems3.5 non-conformances/defects3.6 use of equipment3.7 use of materials/resourcesPage 3 of 5REATC4-014 Issue 1.03.8 staff training and development3.9 supplier data and information3.10 customer data and information3.11 schedules and plans3.12 costs3.13 available technologies3.14 performance/capability3.15 process outcomes3.16 reliability3.17 maintenance and repair3.18 health and safety3.19 environmental and sustainability factors3.20 recycling3.21 other (to be specified)P4 Obtain accurate information on the engineering process from all valid sources
    3. Gather data from two of the following sources of information during the evaluationprocess:4.1 monitoring and audit processes4.2 colleagues4.3 clients4.4 suppliers4.5 general media4.6 specialised media4.7 benchmarking partners
    4. Ensure that the monitoring and evaluation processes comply with three of thefollowing:5.1 organisational guidelines and procedures5.2 recognised compliance agency/body's standards, directives or codes ofpractice5.3 customer standards and requirements5.4 equipment manufacturer's operating specification/range5.5 British, European or International standards or directives5.6 health, safety and environmental requirements
    5. Review all relevant information relating to the engineering process
    6. Prepare the results of the evaluation, to include all of the following:6.1 an appraisal of the effectiveness of the engineering process6.2 evaluation of the cost effectiveness of the engineering process6.3 an appraisal of the compliance of the engineering process with definedcriteria6.4 a recommendation of feasible changes or improvements to theengineering processPage 4 of 5REATC4-014 Issue 1.06.5 a proposed method for monitoring the impact of the improvements tothe engineering process6.6 an appraisal of the effectiveness of evaluation process
    7. Consult with all relevant people during the evaluation
    8. Assess the potential impact of any changes to be recommended
    9. Recommend feasible changes or improvements to the engineering process
    10. Present the results of the evaluation to the appropriate people according to agreedprocedures
    11. Report and communicate results of the monitoring and evaluation, using:7.1 verbal methodsPlus one from the following:7.2 electronic mail7.3 computer-based presentation7.4 computer generated report7.5 specific company document7.6 other appropriate media

    Monitor and evaluate rail engineering processes assessment help

    Unit assessment details

    Loading assessment details…