Specify risk reduction methods and procedures — EAL Vocational Motor Vehicle & Transport
Learning outcomes
- Obtain existing risk analysis information for two of the following engineeringactivities:1.1 manufacturing (such as machining, fabrication, welding, material finishingor manufacture, assembly, joining)1.2 design1.3 research1.4 product or system installation1.5 commissioning1.6 decommissioning or recycling1.7 environmental or sustainability1.8 operational processes (such as movement of materials and logistics)1.9 maintenance practices (such as preventative, corrective, predictive,reactive or prevention)1.10 processing operations1.11 service supplies (such as gas, water, electricity)1.12 engineering support functions (such as procurement, quality assurance,inspection, testing, scheduled safety audits and risk assessments,business improvement)P1 Obtain accurate details of the risks
- Demonstrate the required behaviours in line with the job role and companyobjectives
- Consider the effect and cost of changes or improvements on six of the following:2.1 materials used2.2 operational instructions/procedures2.3 the operational process2.4 workplace environment/sustainability2.5 health and safety2.6 equipment, systems or related technologies2.7 work patterns2.8 personal protective equipment (PPE)2.9 system reliability2.10 training and development2.11 quality of products or services2.12 logistics2.13 marketing/brandingPage 3 of 5REATC-018 Issue 1.02.14 employee downtime2.15 staff availability2.16 other (to be specified)P3 Select the most effective methods to reduce risks
Show all 10 objectives
- Identify the resources that are necessary to implement the risk reduction methods
- Specify or use three of the following resources necessary to implement riskreduction methods:3.1 process or operation expertise3.2 auditing and monitoring services3.3 additional personnel3.4 external expertise3.5 HSE or similar expert help3.6 regulations, directives and guidance documentation3.7 engineering design/research or similar expertise3.8 company policy advice3.9 human resources (HR) personnel department information3.10 other (to be specified)S4 Specify risk reduction methods that take into account all of the following asappropriate:4.1 health and safety requirements and appropriate codes of practice4.2 the potential for further risks occurring4.3 data gathering4.4 revised management procedures4.5 when to implement risk reduction actions4.6 prioritisation and decision making4.7 consideration of interim effects on the process4.8 recording of risk analysis data4.9 other (to be specified)P5 Identify the activities required to implement the risk reduction methods
- Specify clearly the procedures for implementing the risk reduction methods
- Ensure that the risk reduction methods and procedures comply with all relevantregulations, directives and guidelines
- Ensure that risk reduction methods and procedures comply with three of thefollowing:5.1 organisational guidelines and procedures5.2 recognised compliance agency/body's standards, directives or codes ofpractice5.3 equipment manufacturer's operating specification/range5.4 customer standards and requirements5.5 health, safety and environmental requirements5.6 British, European or International standards or directivesPage 4 of 5REATC-018 Issue 1.0P8 Utilise opportunities to promote the implementation of the risk reduction methods
- Record the risk reduction methods and procedures in the appropriate informationsystems
- Record and communicate the risk reduction methods and procedures to theappropriate people using:6.1 a verbal reportPlus one from the following:6.2 computer-based presentation6.3 electronic mail6.4 specific company document6.5 computer generated report6.6 other appropriate media
Specify risk reduction methods and procedures assessment help
Unit assessment details
Loading assessment details…