    Semi-variable (mixed) costs contain both a fixed element and a variable element, so the total changes with activity but not in direct proportion to it.

    • Point 5 of 20

    Study notes

    From the teaching notes for this specification point.

    The idea

    Semi-variable (mixed) costs contain both a fixed element and a variable element, so the total changes with activity but not in direct proportion to it. A common example is a utility bill with a standing charge plus a charge per unit used: the standing charge is fixed and the usage charge varies with output. In marginal costing the fixed element is treated as a period cost and the variable element is included in the marginal cost of a unit. To separate the two elements, use the high-low method: take the difference in total cost between the highest and lowest activity levels and divide by the difference in activity to find the variable cost per unit, then subtract the variable element to find the fixed element.

    What earns the marks

    • Defines a semi-variable cost as containing both a fixed element and a variable element.
    • Explains that the total of a semi-variable cost changes with activity but not in direct proportion to it.
    • Separates the fixed and variable elements using the high-low method.
    • Treats the fixed element as a period cost and the variable element as part of marginal cost in marginal costing.

    Common mistakes and how to put them right

    • Treats a semi-variable cost as wholly fixed.

      Put it right: Recognise that part of the total varies with activity.

    • Treats a semi-variable cost as wholly variable.

      Put it right: Recognise that a fixed element remains regardless of output.

    • Divides total cost by total activity without separating the elements.

      Put it right: Use the high-low method to isolate the variable cost per unit.

    Exam tips

    • Identify the fixed element as the cost incurred at zero activity and the variable element as the change per unit of activity.
    • Apply the high-low method using the highest and lowest activity levels, not the highest and lowest costs.
    • State clearly which element is treated as a period cost and which enters marginal cost.

    Try the lesson

    The start of the Marginal costing: semi-variable costs lesson, made from teaching notes for this specification point.

    Have a go first

    A machine's monthly cost is £2,000 fixed plus £3 for each unit produced. In a month when 500 units are produced, what is the total semi-variable cost?

    There is more to this lesson

    The full lesson goes on to check your understanding and help you earn the marks. Create a free account to carry on, with your progress saved.

    Carry on with the full lesson

    A week of Premium from your first lesson · Then the free plan continues · No card, no charge

    Test your understanding of Marginal costing: semi-variable costs