Marginal costing: stepped costs
Stepped costs, also called step-fixed costs, stay constant over a band of activity and then jump to a new, higher constant level when activity passes a threshold, for example one supervisor at…
- Point 7 of 20
Study notes
From the teaching notes for this specification point.
The idea
Stepped costs, also called step-fixed costs, stay constant over a band of activity and then jump to a new, higher constant level when activity passes a threshold, for example one supervisor at £2,500 per month covers up to 1,000 units, and a second supervisor is needed from 1,001 units, raising the total to £5,000. Within each step the cost behaves like a fixed cost; across steps the total rises in discrete jumps rather than smoothly. In marginal costing, stepped costs are usually treated as period costs and deducted from contribution, but for decisions near a step boundary the extra step cost is relevant. Identify the step size and the activity range before deciding which level applies.
What earns the marks
- Defines a stepped cost as one that is constant within a band of activity and rises in discrete jumps at defined thresholds.
- Gives a worked example showing the total cost at two activity levels either side of a step, such as one supervisor versus two.
- Explains that within each step the cost behaves like a fixed cost, so cost per unit falls as activity rises within the band.
- States that the additional step cost becomes relevant when a decision pushes activity past a threshold.
- Treats stepped costs as period costs deducted from contribution in a marginal costing statement unless a step is triggered.
Common mistakes and how to put them right
Treats a stepped cost as perfectly variable, rising smoothly with every unit.
Put it right by showing the flat band followed by a jump.
Ignores the step when activity crosses a threshold.
Put it right by adding the extra step cost once the boundary is passed.
Assumes the cost per unit is constant across all output.
Put it right by recalculating cost per unit within each band.
Confuses stepped costs with ordinary fixed costs.
Put it right by identifying the activity level at which the total changes.
Exam tips
- Identify the step size and threshold from the data before calculating any total.
- Check which side of the threshold the activity level falls on, then apply the correct number of steps.
- Show the total cost at the actual activity level, not an average across bands.
Try the lesson
The start of the Marginal costing: stepped costs lesson, made from teaching notes for this specification point.
Have a go first
A delivery firm hires vans at £350 per month each, with one van able to cover up to 1 200 deliveries a month. In a month with 3 400 deliveries, what is the total van hire cost?
There is more to this lesson
The full lesson goes on to check your understanding and help you earn the marks. Create a free account to carry on, with your progress saved.
A week of Premium from your first lesson · Then the free plan continues · No card, no charge
Test your understanding of Marginal costing: stepped costs