AQA · A-Level · Accounting

    Course version: 7127 · Version from Sept 2017

    The interrelationship between variances.

    Full specification wording

    Standard costing and variance analysis: The interrelationship between variances.

    Variances rarely occur in isolation, so a standard costing report is read as a set of linked signals rather than separate numbers.

    • Point 7 of 10

    Study notes

    From the teaching notes for this specification point.

    The idea

    Variances rarely occur in isolation, so a standard costing report is read as a set of linked signals rather than separate numbers. A favourable materials price variance may arise from buying cheaper, lower-quality material, which then produces an adverse materials usage variance through extra waste; the two must be judged together. Similarly, using cheaper labour can give a favourable labour rate variance but an adverse labour efficiency variance if less-skilled workers take longer. Sales price and sales volume variances interact when a price cut raises units sold. When one variance is investigated, check the related variance before drawing a conclusion, and consider whether the cause is operational or a revision of the standard itself. This reasoning supports the interpretation and evaluation of variances rather than their arithmetic alone.

    What earns the marks

    • Explains that a favourable variance in one area can cause an adverse variance in a related area.
    • Links a cheaper purchase price to possible quality problems and an adverse usage variance.
    • Links a lower labour rate to possible lower skill and an adverse efficiency variance.
    • Recommends investigating related variances together before judging performance.
    • Distinguishes an operational cause from an out-of-date or inappropriate standard.

    Common mistakes and how to put them right

    • Judges each variance on its own sign without checking related variances.

      Put it right: Read price and usage or rate and efficiency as a pair.

    • Assumes every favourable variance shows good performance.

      Put it right: Recognise that a cheap purchase can raise waste and cost.

    • Blames the standard automatically when variances appear.

      Put it right: Consider operational causes before revising the standard.

    Exam tips

    • Name the specific pair of variances you are linking, such as price and usage.
    • State the direction of each effect so the causal chain is clear.
    • Use the phrase 'may' where the link is possible rather than certain, and justify it.

    Try the lesson

    The start of the Standard costing and variance analysis: The interrelationship between variances. lesson, made from teaching notes for this specification point.

    Have a go first

    In standard costing, why are the material price and material usage variances often analysed together rather than in isolation?

    There is more to this lesson

    The full lesson goes on to check your understanding and help you earn the marks. Create a free account to carry on, with your progress saved.

    Carry on with the full lesson

    A week of Premium from your first lesson · Then the free plan continues · No card, no charge

    Test your understanding of Standard costing and variance analysis: The interrelationship between variances.

    Active recall beats re-reading. Take an instant quiz now to test what you’ve learned and lock it into long-term memory.

    Take topic quiz

    A week of Premium from your first lesson · Then the free plan continues · No card, no charge