Complete testing, gauging and acceptance of overhead line equipment — EAL Vocational Motor Vehicle & Transport
Learning outcomes
- Work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines
- Carry out all of the following activities during the testing and gauging:a) adhere to safety briefing instructions, risk assessments, COSHH, safe system of work and other relevant safety standardsb) checks to ensure currency of installation documentation (such as drawings, layouts, instructions, manufacturers' data, settings and other documentation)c) obtain authority before carrying out the testing activitiesd) dispose of waste items in accordance with the project plane)
- leave the work area in a safe condition
Show all 20 objectives
- Select and use correctly six of the following types of personal protection equipment:a) safety harnessesb) safely helmetsc) approved high visibility clothingd) approved safety footweare) glovesf) gogglesg) ear protection (as appropriate)h) other specific equipment
- Use the correct tools, plant and equipment for the testing and gauging activities and check that they are in a safe and usable condition and are fit for purpose
- Interpret all the following design drawings and specifications for the testing and gauging requirements:a) layoutsb) cross sectionsc) inspection/test pland) electrical section diagrams
- Follow all relevant setting up and operating specifications for the products or assets being tested
- Carry out all of the following testing/gauging activities:a)
- use of measurement and recording equipment to check profile/set up/clearanceb)
- record readings on test planc)
- use of test pantographsd)
- use of bond testerse)
- use of magnet strength and polarity (S and P) testersf) assist with electrical section proving.8.
- Follow the defined procedures and set up the equipment correctly so that all operating parameters are achieved
- Check and confirm that all necessary connections, fittings and components are secure
- complete and free from damage
- Carry out checks on the OLE to include all of the following:a) checking that the installed components comply with the installation specificationb) checking final adjustments for position, clearances, level and alignmentc) making visual checks for completeness and freedom from damaged) checking locking devices (as appropriate)
- Complete all relevant testing, gauging and acceptance documentation accurately and legibly
- Follow relevant recording and reporting procedures to include one of the following:a) installation recordb) handover documentc) other specific recording document
- Deal promptly and effectively with problems within their control and report those that cannot be solved.1.
Complete testing, gauging and acceptance of overhead line equipment assessment help